Figure 2- 5
Note:
1. Grooving width requirement of 30 ~ 50mm width, depth requirement 8mm;
2. When cutting, the four corners should be cut 45 ° chamfer, the coil wire protection;
3. Before the assembly line, to deal with grooving to clean up, to ensure that no debris
trough; if cleaned with water trough, the need for air-drying operation blow tank, to be
completely dry before winding groove;
4. Wrap, tap to be reserved well refuges hand in hand well set aside a certain redundancy;
5. Wind clockwise order around 5 bar. When wound, blunt-by-turn required the cable
compaction;
6. A coil to the cable hand hole section leads to two lines to be twisted, requires at least 20
pair / m density;
7. Upon completion of the winding, the need to refill the survey line groove. The main test
parameters off and the coil inductance inductance values required to be between 80 ~
1000uH;
8. Recommend to use about 80
℃
asphalt fill slots. Avoid foaming when filling slots drip
hollow, uneven, etc., affect the performance and appearance. After the asphalt dried, the
excess part of the road leveled.
2.3
AUX Installation Bracket
ITC237-PW1A-IRZ model of camera, can be used for docking two stents, one for
companies supporting pole bracket, the other is widely used in engineering all-direction
bracket. According to user matching stand is different, their installations vary greatly, the
following camera supports the installation of two stents described in detail.