
Installation Guide
© 2019 Dahua. All rights reserved. Design and specifications are subject to change without
notice. Pictures in the document are for reference only, and the actual product shall prevail.
Settings of Blackbody
1. Power up the Blackbody by connecting
the 230V socket provided and turn it
on.
2. Turn up the temperature to 35° by
clicking the upwards arrow until the
temperature is set.
3. Wait 30 minutes until the Blackbody is
ready but continue the installation
while the Blackbody gets ready.
Confirm by checking the temperature
afterward.
12