background image

III 

Construction Safety Instructions 

 

Construction  workers  must  wear  protective  equipment  such  as  reflective  vest  to  ensure 

safety during construction. 

 

Construction sites must be blocked off and placed with signs. Specific requirements are as 

follows: 

 

Work on city road

: Place in sequence work zone warning sign, work zone speed limit sign, 

and  traffic  guidance  sign  150  meters  away  of  coming  vehicles  from  the  work  zone.  In 

addition, put work zone safety barriers at reasonable intervals to form a safe work zone and 
protect workers’ safety. 

 

Work  on  expressway

:  Put  work  zone  warning  sign  at  safe  area  (such  as  near  hard 

shoulder  or  crash  barrier)  and  1.5  km  away  of  coming  vehicles  from  the  work  zone.  In 

addition, place in sequence work zone speed limit sign, traffic guidance sign, and work zone 

distance  sign  around  150  meters  to  the  work  zone.  Put  work  zone  safety  barriers  at 

reasonable intervals to form a safe work zone, and place traffic guidance sign at corners of 

the work zone. Put sign of canceling work zone speed limit at a safe place 150 meters away 

of leaving vehicles from the work zone. 

 

Lifting  work  or  aerial  work

:  The  work  zone  must  be  placed  with  clear  danger  sign  and 

danger warning light at night. Responsible person should be designated to guide people to 

detour. Do not enter or stay in work area. 

 

Aerial  work  platform

:  Make  sure  that  its  parking  position  is  ideal  for  aerial  work.  Check 

whether the support legs of aerial work platform are put in place to support the telescopic 

boom, and whether heavy-current circuit is connected within the work zone. Make sure the 

boom will not touch any object when it is extended. 

 

Workers  should  fasten  safety  belt  and  wear  helmet,  and  properly  place  equipment,  tools 

and personal belongings to prevent injuries from falling objects. 

 

Heavy current engineering

: During wiring, joint with the heavy current part exposed should 

be wrapped with insulated and waterproof tape, which will be put into waterproof insulated 

box. When the device is connected to heavy current, make sure the circuit works, and the 

insulation cover of cable is inserted into terminal to prevent the insulation cover separating 

from the copper wire, resulting in the copper wire exposed. For old wire construction, make 

sure no power is connected, and then start construction. 

 

Grounding

: Make sure all electric devices are properly grounded during construction. 

Содержание ANPR

Страница 1: ...ANPR System Installation Guide V1 0 0 ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD...

Страница 2: ...ignal Words Meaning Indicates a high potential hazard which if not avoided will result in death or serious injury Indicates a medium or low potential hazard which if not avoided could result in slight...

Страница 3: ...shall conform to the requirement of the Safety Extra Low Voltage SELV standard and supply power with rated voltage which conforms to Limited power Source requirement according to IEC60950 1 Please no...

Страница 4: ...rk zone Lifting work or aerial work The work zone must be placed with clear danger sign and danger warning light at night Responsible person should be designated to guide people to detour Do not enter...

Страница 5: ...raffic Pole 12 3 2 4 Outdoor Distribution Board 12 3 2 5 Air Switch Power Surge Protector Ethernet Surge Protector 13 3 2 6 Fiber Optical Transceiver and Switch Optional 13 4 Installation 14 Installat...

Страница 6: ...with built in white light strobe models with IR supports IR during night time 1 0 01 09 12649 DHI ITC431 RW1 F IRL8 Universal mounting bracket 1 2 01 13 1207 8018 1 3 dimensional universal mounting b...

Страница 7: ...6 2 System Structure...

Страница 8: ...of intelligent transportation for dynamic detection of moving vehicles It can detect vehicles of 1 lane The radar is featured by high speed detection accuracy deviation within 1km h strong anti interf...

Страница 9: ...verse connection protection Interface protection Output interfaces are designed with overvoltage and overcurrent protection Working environment Temperature 30 C to 70 C Humidity 10 to 90 Dimensions Ra...

Страница 10: ...on frequency error 1 MHz Frequency modulation bandwidth 250 MHz Effective isotropic radiated power EIRP 20 dBm Refresh time 50 ms Communication interface RS 485 RS 232 Wifi Baud rate 9600 bps 256000 b...

Страница 11: ...supports multiple protocols USB port 1 external USB2 0 port Ethernet port 2 RJ45 100M 1000M self adaptive Ethernet ports and 4 RJ45 100M industrial grade switch network ports Power interface 12 V DC...

Страница 12: ...tton Description Activity indicator Activity indicator keeps on when the device is running Activity indicator flashes when upgrading program 1 2 3 4 RJ45 100M switch network port GIGA 100M 1000M self...

Страница 13: ...ashing light trigger cable RVSP2 0 5 Strobe trigger cable RVSP2 0 5 Radar power supply cable RVSP4 0 5 3 2 3 Traffic Pole It is used for fixing camera flashing light and strobe Size of traffic pole de...

Страница 14: ...e Protector We recommend to using CHNT air switch DXH06 F power surge protector and FRX SL RJ45 Ethernet surge protector 3 2 6 Fiber Optical Transceiver and Switch Optional We recommend to using indus...

Страница 15: ...14 4 Installation Installation Diagram 4 1 Installation diagram Figure 4 1...

Страница 16: ...alled at center of the scenario over the center of Lane 2 Radar Installed at 1 meter away from the center of Lane 2 with 18 vertical angle and 3 4 horizontal angle recommended For installations of non...

Страница 17: ...section takes mounting DHI ITARD 024SA radar for example Mount the radar panel to the radar bracket Step 1 Pay attention to the mounting direction of radar panel The radar bracket is designed with 4 h...

Страница 18: ...edge storage device is provided You can install edge storage device according to project requirements Edge storage device integrates switch and fiber optical transceiver on one device and provides mor...

Страница 19: ...ure 4 7 Dual Segment Networking Method In this method the camera and the platform are configured in different network segments The default Ethernet card IP address is 192 168 1 108 See Figure 4 8 Dual...

Страница 20: ...nect the radar and the camera Radar should be powered separately and its power adapter should be placed in wall mounted or floor standing cabinet Make sure to use extension cord to connect the cabinet...

Страница 21: ...ure 5 2 Connecting Radar Power Cable 5 4 Radar is supplied with 12 V DC power and its power adapter should be placed in wall mounted or floor standing cabinet Use RVVP cable to be the extension cable...

Страница 22: ...tting ITC Lane Property Radar Type Parameters of the selected radar need to be configured at the right side of the interface Speed Limit Config For Size disabled You can configure the low high speed l...

Страница 23: ...h speed will be the detected speed if out of such range then the speed will be a random value within speed limit Delay Speed Wait Commissioning Radar 6 2 Check the cable connection of radar Step 1 The...

Страница 24: ...ection again We recommend to doing the commissioning at night Properly adjust the angle of strobe Step 2 Make sure the light spot in the video image at the center of scenario horizontally and 1 2 of t...

Страница 25: ...24 Commissioning flashing light Figure 6 4...

Отзывы: