14
③
⑤
④
②
①
Discharge Cover
ASSEMBLING ICE CREAM CHAMBER SET
Chamber
Ice Cream Strainer
Hopper
Screw
Assembly Guide
Screw Packing
Ice Cream Strainer Guide Bumps
Assembly Guide
Screw
02
Remove the extraction packing in the
discharge cover.
1. When making ice cream,
remove the extraction packing.
2. Do not remove the seal packing.
01
04
Place the screw in the assembly in 01
Make sure the screw packing (
④
) is
properly placed under the screw before
putting the parts together.
05
4DC01742 사용설명서 DT-SJ-19(102-A2) 7개국어_V.00.indd 14
2019-08-13 오후 6:28:04