2) Before separate BOBBIN(5), CORD PLUG(9) pull out from the pocket of BRACKET(1)
and push LEVER CR(2) for reducing the elasticity of REEL SPRING
3) Unscrew a SCREW (#20) and separate BOBBIN(5) from BRACKET(1)
and check the contackts between the Y TERMINALS(13,14) and RING TERMINALS(7,8)
4) Check LEVER SPRING(4)
5) If ROLLER BRAKE(3) is worn out and Unscrew a SCREW(5),
separate LEVER(2) from BRACKET(1) AND replace ROLLER BRAKE(3)
6) If REEL SPRING(17) is broken, unscrew 2 SCREW(19) and replace it.
7) Unscrew a SCREW(10) and HOLDER TERMINAL(6) from BOBBIN(5)
check the connections between POWER CORD(9) and RING TERMINAL(7,8)
8) When assembling, make ther reserved winding 5 revolutions of BOBBIN clockwise.
When disassembling, The REEL SPRING may spring out of the Cover
CAUTION
Содержание RCC-250F
Страница 1: ...NOV 2005 Model RCC 250F RCC 250B RCC 250S RCC250S001 VACUUM CLEANER...
Страница 5: ...2 2 External Components View I 1 I 2 E B D A K J L F C G 2 G 1 H 1 H 2 H 3 3...
Страница 7: ...3 1 3 RCC 250S Wiring Diagram 5...
Страница 20: ...6 1 RCC 250S Cleaner Assembly 8 10 2 3 4 7 5 1 6 9 14...
Страница 22: ...6 2 RCC 250S Body Assembly 6 1 6 2 6 3 16...
Страница 24: ...6 3 RCC 250S Cover Assembly 4 3 2 2 2 2 3 2 1 3 1 4 18...
Страница 26: ...6 4 Motor Case Assembly 9 1 9 2 2 3 5 9 10 1 8 4 7 PCB 8 RCC 250F RCC 250S RCC 250B 6 20...
Страница 28: ...6 5 Cordreel Assembly 1 1 2 3 5 4 8 6 9 10 12 15 13 14 15 17 16 18 19 20 CORD REEL AS 5 22...
Страница 31: ...6 7 Dustbox Assembly 18 6 19 15 16 18 7 13 1 14 19 12 11 10 9 8 3 4 6 2 5 17 18 3 18 2 18 1 18 4 18 5 25...
Страница 36: ...6 10 RCC 250B RCC 250S Brush Assembly Pedal Brush 12 11 7 4 3 14 6 9 8 15 1 10 15 13 2 5 30...