48
• situation : PCB shows "E3".
cause)
☞
FAN MOTOR can not work.
countermeasures)
☞
Replace the Fan Motor.
part name
checking results
repair method
disassemble process of Fan Motor
FAN MOTOR
fan motor failure
replace
fan motor
1
Disassemble Duct Cover As from Duct B As
(Screw 4EA)
2
Disassemble FAN AS From Duct Cover As
(Fixed by 8mm NUT)
3
Disassemble the FAN MOTOR(SCREW 3EA)
parts
Control time
MOTOR
10 sec On, 10sec Off
DRAIN MOTOR
Continous working
FAN MOTOR
Continous working
DRY HEATER
100°C On, 110°C Off
INLET VALVE
5sec On, 20sec Off
Remarks) control times of each parts during dry process
DUCT COVER AS
Fixed By 8mm NUT
Содержание DWD-E115R
Страница 1: ...DRUM WASHING MACHINE DEC 2006 DWD E115R DWD E113R WDE115R001...
Страница 14: ...11 3 CABINETFASSY 1 PREMIUM TYPE...
Страница 16: ...13 3 CABINETFASSY 2 LUXURY TYPE...
Страница 18: ...15 4 CABINETASSY...
Страница 20: ...17 5 BASEUAS...
Страница 22: ...19 6 TUBASSY...
Страница 24: ...21 7 DUCTBAS DUCTPIPEAS...