Pin Signal
1 Red
2 Green
3 Blue
4
GND
5
GND
6
GND - Red
7
GND - Green
8
GND - Blue
9
+5Vdc
10
GND - H.Sync
11
GND - V.Sync
12
Bi-directional Data (SDA)
13
Horizontal Sync
14
Vertical Sync (VCLK)
15
Data Clock (SCL)
8
• Degaussing is always required when adjusting purity or convergence.
• The white balance adjustment has been done by a color analyzer in the factroy. The adjustment
procedure, described in the service manual is made by a visual check.
• Allow 20 minutes warm-up time for the display before checking or adjusting only electrical
specification or function.
• Reform the leadwire after any repair work.
◆
Caution For Servicing
• In case of servicing or replacing CRT, high voltage sometimes remains in the anode of the CRT. Completely discharge
high voltage before servicing or replacing CRT to prevent a shock to the serviceman.
Arrangement of 15-pin D-sub connector
PIN CONNECTOR
CAUTIONS FOR ADJUSTMENT AND REPAIR
1
6
15
10
Содержание 529B
Страница 1: ...ServiceManual XGA COLOR MONITOR Model 529B DAEWOO ELECTRONICS CO LTD OVERSEAS SERVICE DEPT...
Страница 32: ...30 PCB LAYOUT Main PCB Component Side...
Страница 33: ...31 Main PCB Solder Side...
Страница 34: ...32 CRT PCB Component Side CRT PCB Solder Side...
Страница 35: ...33 SCHEMATIC DIAGRAM Power Connection section...
Страница 36: ...34 Control Vertical Out section...
Страница 37: ...35 Horizontal section...
Страница 38: ...36 Video section...
Страница 39: ...37 EXPLODED VIEW MECHANICAL PARTS LIST...