Screws connecting each pipe should be set in concrete.
Close up ends of pipes with stoppers on completion of assembling for safety’s sake.
4mm BOLT(BUTTERFLY NUT)
SET RIGHT ON AND
TIE UP WITH CABLE TIE
4mm BOLT
(BUTTERFLY NUT)
4mm BOLT(BUTTERFLY NUT)
6mm BOLT(BUTTERFLY NUT)
6mm
BOLT
BUTTERFLY NUT
OUT HOSE
IN HOSE
CABLE BOX
OUT PIPE/HOSE
SADDLE
WATER PUMP
WATER
TANK
4mm BOLT(BUTTERFLY NUT)
Содержание M&F DHL-A48
Страница 1: ...3D TYPE HYDROPONICS ...
Страница 5: ...FLAT TYPE HYDROPONICS ...