Cylinder Head/Valve
●
Lightly strike the valve stem end for about 2-3
times to ensure better installation of the valve
and cotter.
NOTE
●
Apply engine oil to the new O-ring, and
assemble it to the carburetor insulator groove.
●
Tighten the carburetor insulator with mounting
bolts.
●
Install the cam chain tensioner, and assemble
pivot bolts.
Torque valve: 1.0kg-m (10N.m, 7ft-lb)
●
Assemble spark plugs.
Torque valve: 1.1kg-m (11N.m, 8ft-lb)
Cylinder Head Installation
●
Clean the gasket marks from the cylinder head
gasket.
●
Assemble the cam chain guide to the cylinder.
●
Assemble the dowel pins and new gaskets.
●
Assemble the cylinder head.
●
Install the camshaft.
●
Install the engine to the frame. (
⇨
section 5)
9-12
Take necessary precautions not to damage valve.
Carburetor
insulator
Cylinder head
Cam chain
guide
Содержание NS125III - SERVICE
Страница 2: ......
Страница 3: ......
Страница 5: ......
Страница 31: ...MEMO...
Страница 52: ...MEMO...
Страница 53: ...Fuel System 5 0 Fuel tank Fuel strainer Fuel pump Carburetor...
Страница 63: ...MEMO...
Страница 67: ...L Crank Case Cover Kick Starter Continuously Variable Transmission 7 0 L crank case cover...
Страница 85: ...Generator Starter Clutch 8 0...
Страница 109: ...Cylinder Piston 10 0 O I L O I L Piston pin clip Piston top ring Piston pin clip Piston 2ND ring Piston Oil ring...
Страница 116: ...MEMO...
Страница 117: ...Transmission Crankshaft Crank Case 11 0 R Crank Case Crankshaft L Crank Case...
Страница 153: ...MEMO...
Страница 177: ...MEMO...
Страница 191: ...MEMO...
Страница 192: ...MEMO...
Страница 193: ...MEMO...
Страница 194: ...Wiring Diagram 19 1 19 Wiring Diagram 19...
Страница 202: ...MEMO...
Страница 203: ...2002 11 PRINTED 1999 11 PUBLICATION SERVICE MANUAL NO COPY...