manualshive.com logo in svg
background image

No.4 Business Building-2707, China Central Place

Email:[email protected]

Chaoyang District, Beijing-100021, China

北 京 大 林 绿 源 环 保 科 技 有 限 公 司

BEIJING DAELIM GREEN EP TECH CO., LTD.

4.2 Location Consideration

Theunitshouldnotbeplacedwithin36inchesofanyobstructionsandampleroomshouldbeprovidedforthe

 

removalofcabinets,covers,andinspectionhatches.Ampleroomshouldbeavailabletoperformperiodic

maintenance inspections and perform repairs as needed. Proper ventilation should be considered to prevent

overheatingoftheunit.Foroutdoorinstallations,properplacement oftheunit should beawayfromwalls,

fences, vegetation, or any other structures that would restrict air movement around the unit.

Special precautions should be taken for units installed indoors. Care should be taken to insure adequate

ventilationisprovided.Auto-closingventsshouldbepermanentlyfixedintheopenpositiontoprevent

unintended closure and accidental overheating of the unit. Fans, blowers or other means of positive air

movement in the space is strongly encouraged to prevent overheating

Indoor Units Recommendation:

1. Thesizeofventsinanenclosedspaceshouldbeatleast20ft

2

ofinletand20ft

2

ofoutletareaper

1000 kVA of unit capacity.

2. High Fire Point Insulating Liquid.

3. Cover Mounted Pressure relief device (PRD) also referred to as Explosion Relief device.

CAUTION:

Check with local authorities in the intended installation area to verify compliance of any and

all applicable laws.

4.3 Mounting theTransformer

Thetransformermustbeplacedonaconcretepadorsteeldeckof sufficient strengthtosupport thefull

weight oftheunit.Thelocationmustbeflatandlevel andpreparedtoprevent thetransformerformtilting

beyond two degrees from horizontal

WARNING:

FireHazard.Non-levelinstallationoftransformercanresultinfireandcausesevere

personalinjuryordeath.Preparetransformerinstallationsitesuchthattransformerdoesnottiltmore

than two (2.0) degrees from horizontal while the transformer is in service at the site.

To maintain full cabinet security, the transformer tank and cabinet base have provisions for installing cleats to

secure transformer to pad. If gapsstill exist between the cabinet and pad after cleatingthe cabinet,the

installationwillnotprovidethesecurityneededtopreventtamperingbythepublic.Addapermanentmortar

seal to fillthe gaps.

4.4 External Connection

ELECTRICAL SHOCK

: Hazardous voltage can cause severe injury, death, or damage to equipment.

Groundtransformerfollowingindustry-acceptedsafegroundingpracticesbeforemakingother

electrical connections. De-energize power distribution wires that will be connected to transformer.

Verify that wires are de-energized at the transformer before connecting to transformer.

Содержание GREEN EP TECH

Страница 1: ...District Beijing 100021 China Email info daelim electric com BEIJING DAELIM GREEN EP TECH CO LTD Operation Maintenance Manual SinglePhase ThreePhasePad mountLiquid CompartmentalTransformer Filled KVA...

Страница 2: ...age for more than 90 days 7 3 3 Removable Radiators 7 4 Installation 7 4 1 Pre service inspection 7 4 2 Location Consideration 8 4 3 Mounting the Transformer 8 4 4 External Connection 8 Ground Connect...

Страница 3: ...ing 27 Bay O Net Fuses 27 Bay O Net fuse replacement instruction Fig 17 B 28 Dry Well Canister Fuses 28 Non Loadbreak Dry Well Canister Fuse replacement instruction Fig 18 B 29 Loadbreak Dry Well Cani...

Страница 4: ...usiness Building 2707 China Central Place Email info daelim electric com Chaoyang District Beijing 100021 China BEIJING DAELIM GREEN EP TECH CO LTD 9 2 Routine Inspection 33 9 3 Dielectric Fluid Sampl...

Страница 5: ...al injury hazards Obey all safetymessagesthat follow thissymbol to avoid possibleinjuryor death Safety Instructions WARNING A potential risk exists if operating instructions are not followed which cou...

Страница 6: ...eightreceipt Da el i m Industries ships most units FOB Point of Manufacture and it is the customer s responsibility to file a claim against the carrier Note Ifacceptanceofthetransformerismadeanddamage...

Страница 7: ...lacewhereaccessibilitytoacraneorother overheadliftingdeviceislimitedornotavailable Iftheunitmustberolled insurethattheareaislevel free from obstructions and debris and is of sufficient strength and th...

Страница 8: ...r assemblies shouldnever be stored directly on the ground or in areas in which water could collect near sealed openings 4 Installation 4 1 Pre service inspection ELECTRICALSHOCK Neverattempttochangeco...

Страница 9: ...unted Pressure relief device PRD also referred toas Explosion Reliefdevice CAUTION Check with local authorities in the intended installation area to verify compliance of any and all applicable laws 4...

Страница 10: ...ndedandthetransformeris connectedtothepowerdistributionsystem thenthetankshouldbe regardedasenergized Anenergized tankisextremelydangerous Contactwithanenergizedtank canshock burn or causedeath Daelim...

Страница 11: ...turallyexpandandcontractcausingthegasfilledheadspaceinsidethetanktofluctuateinpressure CAUTION Before performing any kind of service which may include but is not limited to opening the tank or inspect...

Страница 12: ...rader Valve Fig 4 B is provided to facilitate addition of dielectric fluid and Nitrogen to the tank 5 3 Drain Valve and Fluid Sampler TheDrainValveandFluidSampler Fig 5 isprovidedtofacilitatesamplingo...

Страница 13: ...htseparationbetweentheinterioroilandtheoutsidetominimize potential leaks Daelim utilizes several different brands and models of liquid level gauges depending on the application Transformers can be sup...

Страница 14: ...dneedle maximumindicator can be reset by turning the knob on the front of the gauge face The temperature gauge consists of a long thermocouple that extends into the tank inside a protective thermocoup...

Страница 15: ...armed by a consistent negative pressure for example if it s winter time In Wisconsin it will probably be negative for the duration of the season However if the gauge consistently readszeroanddoesnotap...

Страница 16: ...Valveasshownin Fig 3 whichonlyreleasespressureslowlytoaccountforthermal expansionandcontraction APRDiscovermountedandequippedwithaspringloadeddiaphragmthatis factorysettoopenatapredeterminedpressurele...

Страница 17: ...l in relay ThisRPRR Fig 10 isadevicefordetectionofsuddenpressureeventsbasedontherateofpressurerisein Thetransformer Whenadangerous pressurerise hasbeendetected therapidpressurerise relay RPRR will cha...

Страница 18: ...his system consists of thermocouples wound intoeachcoilofthetransformerinstrategiclocationstoaccuratelymonitorthetemperatureinsidethecoil itself Thethermocoupleleadsarebrought outofthetankthroughaseal...

Страница 19: ...ided optionally for units supplied with radiators to increase the KVA capacityofthetransformerbyupto25 withoutoverheatingorexperiencingdetrimentaleffects Thesize andnumberoffanscanvary dependingonthea...

Страница 20: ...ormers may be equipped with CT s for various reasons such as metering or relaying they also may be equipped with meters mounted on the transformer Different types and classes of CT s are used accordin...

Страница 21: ...tches 6 1 Tap Changers ExternallyoperatedNo LoadTapchanger NLTC Fig 14A B isprovidedforalltransformers unless otherwise specified to change from one operating voltage to another Typical taps are confi...

Страница 22: ...nsformer secondary connected equipment verify that all transformer secondaryterminalshavezerovoltageandgroundthetransformersecondaryterminalsfollowing industryacceptedsafegroundingpractices Groundings...

Страница 23: ...unt transformerstoselectthefeedsource openorclosethefeed thruloopandopenorclosethetransformer The spring loaded activating mechanism ensures quick load break action and positive contact engagement thr...

Страница 24: ...er nameplate WARNING The transformer must be de energized and grounded before dual voltage switch is operated Attempting to change dual voltage switch on an energized transformer may result in damage...

Страница 25: ...eplate WARNING The transformer must be de energized and grounded before dual voltage switch is operated Attempting to change dual voltage switch on an energized transformer may result in damage to the...

Страница 26: ...ct surge arresters before running impulse or applied potential tests on the transformer Surge Arresters Fig 16 are provided optionally in padmount transformers to protect equipment and cables from ove...

Страница 27: ...100021 China Email info daelim electric com BEIJING DAELIM GREEN EP TECH CO LTD Live front SurgeArresters Live front Surge Arrester Fig 19 B is a polymer that houses a metal oxide Varistor to provide...

Страница 28: ...d Donotre energizesuspectedfailedequipment Afterinstallingfuses energizetransformerfroma remote upstreamsource WARNING Never attempt to remove fuses with pressure on the tank Severe burns and personal...

Страница 29: ...y O Net housing 5 Draw fuse holder out quickly 8 10 inches to interrupt load 6 Wait several seconds for fluid to drain from the fuse holder and remove from housing 7 Remove fuse cartridge from fuse ca...

Страница 30: ...4 set screws 3 Attach a hot stick to the fuse holder eye and pull out 4 Draw fuse holderout 5 Replace the fuse and reinsert the fuse with the fuse holder 6 Assemble by tightening 4 set screws Loadbre...

Страница 31: ...Solubility in water negligible 0 1 Viscosity 9 3TO9 5CsTat40 C 7 2 High Fire Point Dielectric fluid Padmount transformers filled with High Fire Point Dielectric fluid typically use Envirotemp FR3 flui...

Страница 32: ...in the winding due to excitation current and conductor loss duetocirculating current in parallelwindings These losseschange withthe excitation voltage Excitationcurrent no loadcurrent isthecurrentthat...

Страница 33: ...ngs to ground or between individual windings Insulation resistance tests are commonly measured in mega ohms or may be calculated from measurements of applied voltage and leakage current Temperature Ri...

Страница 34: ...conditions of the site into consideration Salty damp or otherwise corrosive environments will require shorter inspection intervals than dry and mild conditions Periodicallycheckbetweentheradiators ife...

Страница 35: ...ectric Fluid Sampling Dielectricfluid samplesshouldbetaken atleastonan annualbasisand analyzed byDGA Dissolved Gas Analysis RoutineDGAtestingisoneofthebestmethodsofdeterminingthe Health ofatransformer...

Отзывы: