9-4 Disassembly Of Transmission
Remove gear change lever (1 bolt).
Loosen speedometer cable mounting nut, and then
remove the cable.
Remove 3 bolts and remove drive chain protector.
Turn the socket bolt clockwise, and then remove
speedometer gear box.
Caution
The socket bolt is provided with left turn
thread.
Remove 2 bolts, and then remove the drive
sprocket fixing plate, drive chain and drive
sprocket.
Remove gear fill bolt.
Place an oil pan under the ATV, and remove gear
oil drain bolt.
After drained, make sure washer can be re-used.
Install oil drain bolt.
Torque value:
Gear oil fill bolt
3.5~4.5kgf-m
Gear oil drain bolt
0.8~1.2kgf-m
1 bolt
Fill bolt
Drain bolt
Speedometer cable
Socket bolt
3 bolts
2 bolts
Содержание ET300 - SERVICE
Страница 1: ...1 ET 300 Service Manual ...
Страница 134: ...Install the steering shaft nut and tighten it This nut is under this steering shaft Torque 50 N m 37 lbf ft ...
Страница 142: ...REAR BRAKE ...
Страница 160: ......
Страница 161: ...17 8 Wiring Diagram ...