5
DRAWING AND PART FILE
MODEL
NAME:
MOUNTING EXPLODED(EPSON)_NO_IR
MODEL
LOCATION:
S:\Engineering\Solidworks Files\EPSON IDEA\INSTRUCTIONS\
SHEETS:
1 OF 1
THE INFORMATION AND DESIGNS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL
AND PROPRIETARY PROPERTY OF MILESTONE AV TECHNOLOGIES NEITHER THIS
DESIGN NOR ANY INFORMATION CONTAINED IN THIS DRAWING MAY BE
REPRODUCED OR DISCLOSED TO OTHERS WITHOUT EXPRESS WRITTEN CONSENT
OF MILESTONE AV TECHNOLOGIES.
THIS PRINT SUPERSEDES ANY
PRINT DATED PRIOR TO:
PART NO:
26206
5/30/2014
REVISIONS
REV.
DESCRIPTION
CHNGD BY:
DATE:
APPR'D BY:
TOLERANCES:
DECIMAL:
.XX = ±.010
.XXX = ±.005
FRACTIONAL:
= ±.015
ANGULAR:
= ±1°
1:18
DRAWN BY:
ADW
DATE:
4/16/2014
APP'D BY:
DATE:
X.XXXX
1/19/2011
MATERIAL NO:
MULIT
FINISH:
TYPE OF FINISH
sw
NAME:
EXPLODED VIEW FOR INSTRUCTIONS
SCALE:
DA-LITE SCREEN CO.
WARSAW, INDIANA, USA
PART NO:
26206
Wall Mounting Instructions
NOTE:
Use appropriate mounting hardware for the wall type and
to accommodate for the screen’s hanging weight (Figure 2).
Hardware is not provided.
1. Secure the wall bracket to wall studs at the desired height. Center
the wall bracket with the screen frame. You will need at least 1"
clearance above the drilled holes to hang the screen (Figure 2).
2. To install the (2) L-brackets, you must measure the overall height
of the screen frame and subtract 1⅛" (29 mm). Using that
dimension, measure down from the top edge of the wall brackets
and mark the wall for two screw holes. The outside edge of each
L-bracket must be no greater than 5" (127 mm) away from the left
and right edges of the screen frame (Figure 2).
3. Secure the two L-brackets to the wall at the marked locations. The
longest side of the two L-brackets should be pointing upwards
when secured in order to hide the L-brackets behind the screen
frame once the screen is installed.
NOTE:
The L-brackets are necessary to maintain a flat
surface for touch interactivity.
4. This step requires two people. Hang the screen on the wall
brackets. There is a lip on the back of the frame that wedges itself
into the wall brackets once fully installed. Ensure that the screen
clears the L-brackets and that the screen weight is on the wall
brackets, not the L-brackets.
Wall Bracket
L-Bracket
No More
than 5"
(127 mm)
Figure 2
Determining Screen Placement:
When installing the IDEA Screen with BrightLink projectors, you must leave at least 22" (56 cm) of
space between the top of the screen and the ceiling to accommodate the projector wall mount.
Screws (Not Supplied)