2
Preparation
Note:
It requires at least four people to assemble an IDEA
Panoramic. To maintain optimal projected image geometry and
screen alignment, a flat and straight wall free from obstructions
and angular distortions should be used.
Tools Required For Assembly
Phillips Screwdriver
Level
Rubber Mallet
Measuring Tape
⅜” Open Wrench
or Socket Driver
Hardware Provided
#8 x 1/2” Screws
Number of supplied screws
varies by screen size
44” Wall Bracket
Number of supplied brackets varies by screen size. See Table 1.
28” Wall Bracket
Number of supplied brackets varies by screen size. See Table 1.
18” Wall Bracket
Number of supplied brackets varies by screen size. See Table 1.
(2) Seam Brace
(6) L-Brackets
(Not included on units with
full length marker tray)
(8) 10-32 Nuts
Choose a clean work area for assembly using padded material or
other soft, clean materials. The work area should be larger than
the overall screen size and directly in front of the location where
the screen is to be installed.
Содержание 27971T
Страница 1: ...INSTRUCTION BOOK FOR IDEA Panoramic...
Страница 11: ...11...