D-D The Aquarium Solution P1 Скачать руководство пользователя страница 5

6

P1

 

DOSING

 

PUMP 

                                                             

www

.theaquariumsolution.

com

 

CALIBRATION

1.

 After connecting to the P1 Pump, the next step in the process is to 

calibrate it. Tap on the pump name to load the configuration page. 
Now tap on ‘

Settings

’ located on the upper right-hand corner. Now 

select ‘

Flow Calibration

’. 

2.

 Prime the line to purge out any excess air. If air is still in the line the 

calibration will be inaccurate. Once you see all air has been purged 
from the line and water starts to pour out, tap on ‘

Stop

’.

3.

 Enter the volume of liquid in the measuring cylinder and tap on 

Complete

’. For increased accuracy, we recommend that you calibrate 

the P1 pump every 4-6 weeks.

DOSING METHODS

The P1 has two methods of operation, ‘

Manual’ 

for single one-time 

dosing and ‘

Planned’

 for a custom 12 stage, 24 hour dosing schedule. 

MANUAL ADD

To dose manually, select ‘

Manual Add

’ from the 

Main

’ screen. Tap the centre of the circle to 

enter your volume amount in millilitres. Tap on 

Confirm

’ and then tap on ‘

Start adding

’. The 

screen will show you a real-time countdown as 
the solution is being added.

PLANNED ADD 

Planned Add

 allows you to create a more intricate 

schedule of up to 12 different time points in a 24 
hour period or to automate a single dosing on a 
daily basis at the same time each day. 

To create a new plan, just tap on the pump name 
you wish to configure and from the top menu, 
select ‘

Plan Add

’. 

Отзывы: