6
P1
DOSING
PUMP
www
.theaquariumsolution.
com
CALIBRATION
1.
After connecting to the P1 Pump, the next step in the process is to
calibrate it. Tap on the pump name to load the configuration page.
Now tap on ‘
Settings
’ located on the upper right-hand corner. Now
select ‘
Flow Calibration
’.
2.
Prime the line to purge out any excess air. If air is still in the line the
calibration will be inaccurate. Once you see all air has been purged
from the line and water starts to pour out, tap on ‘
Stop
’.
3.
Enter the volume of liquid in the measuring cylinder and tap on
‘
Complete
’. For increased accuracy, we recommend that you calibrate
the P1 pump every 4-6 weeks.
DOSING METHODS
The P1 has two methods of operation, ‘
Manual’
for single one-time
dosing and ‘
Planned’
for a custom 12 stage, 24 hour dosing schedule.
MANUAL ADD
To dose manually, select ‘
Manual Add
’ from the
‘
Main
’ screen. Tap the centre of the circle to
enter your volume amount in millilitres. Tap on
‘
Confirm
’ and then tap on ‘
Start adding
’. The
screen will show you a real-time countdown as
the solution is being added.
PLANNED ADD
Planned Add
allows you to create a more intricate
schedule of up to 12 different time points in a 24
hour period or to automate a single dosing on a
daily basis at the same time each day.
To create a new plan, just tap on the pump name
you wish to configure and from the top menu,
select ‘
Plan Add
’.