PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 12 – INSTRUMENTS AND AVIONICS
Revision No.: 22
Date of issue: 2018-09-27
12 - 40
(f) Set the
MASTER BAT
,
GPS
switches to ON and
do a post installation (see 17.6) and
operational test.
12.3.23
Removal of COMM antenna
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
screwdriver
-
wrench No. 7
(a) Set the
MASTER BAT
,
AVIONICS
switches to OFF.
(b) Disconnect the connector (4, Fig. 12-35) from the antenna.
(c) Remove the nuts (4) with the washers (5)
(d) Remove the antenna (1) with the gasket (2), screws (3) and washers (6).
(e) Install the protective cover on the antenna connector.
Fig. 12-35
: COMM antenna removal / installation
1 COMM antenna
2 Gasket
3 Screw (4 pcs.)
4 Nut (4 pcs.)
5 Washer (4 pcs.)
6 Tooth washer (4 pcs.)
7 Cable connector
For information:
8 Fuselage upper part
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...