background image

                       

Rev.03 

 

                                                                   

MUN3CAD05-JF  EVB  GUIDE 

 

BOM LIST:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COUNT 

REF DES 

DESCRIPTION 

PART NUMBER 

MFR 

U1 

Power module, 3.0*3.0*1.3mm 

MUN3CAD05-JF 

Cyntec 

C7, C8, 

C11, C12 

MLCC, 22uF, 6.3V, X7T, 0805 

GRM21BD70J226ME44L 

Murata 

C3 

MLCC, 100pF, 50V, X7R, 0402 

0402B101K500 

Walsin 

R1, R3, R5 

Resistor, 100kOhm, 

±

1%, 0402 

Std 

Std 

R4 

Resistor, 150kOhm, 

±

1%, 0402 

Std 

Std 

R6 

Resistor, 49.9kOhm, 

±

1%, 0402 

Std 

Std 

R7 

Resistor, 31.6kOhm, 

±

1%, 0402 

Std 

Std 

R8 

Resistor, 22.1kOhm, 

±

1%, 0402 

Std 

Std 

C1, C2, C4, 
C5, C6, C9, 

C10, C13 

N.C 

R2, R9, R10 

N.C 

L1 

N.C 

Содержание MUN3CAD05-JF

Страница 1: ...ance according to typical output voltage is shown in table 1 Vout 1V 1 2V 1 8V 2 5V 3 3V RFB_BOT R4 R8 150k 100k 50k 31 58k 22 22k TABLE 1 OUTPUT VOLTAGE SETTING LOAD TRANSIENT RESPONSE INCREASE In some applications adding a ceramic cap CFB C3 in parallel with RFB top may further speedy up the load transient responses recommend capacitance as below table 2 VOUT V CFB C3 pF 0 6 3 3 100 TABLE 2 RECO...

Страница 2: ...MATIC QUICK START GUIDE 1 Power the MUN3CAD05 JF module on while Disable jump open 2 Short S1 S6 can set output voltage from 1 0V to 3 3V S1 S2 S3 S4 S5 S6 VOUT 1V 1 2V 1 8V 2 5V 3 3V N C 3 Short Disable jump can be turn off Power module Load Input Power ...

Страница 3: ...Rev 03 3 MUN3CAD05 JF EVB GUIDE PRIENTED CIRCUIT BOARD LAYOUT Top Layer Mid 1 Layer Mid 2 Layer Bottom Layer ...

Страница 4: ...2 MLCC 22uF 6 3V X7T 0805 GRM21BD70J226ME44L Murata 1 C3 MLCC 100pF 50V X7R 0402 0402B101K500 Walsin 3 R1 R3 R5 Resistor 100kOhm 1 0402 Std Std 1 R4 Resistor 150kOhm 1 0402 Std Std 1 R6 Resistor 49 9kOhm 1 0402 Std Std 1 R7 Resistor 31 6kOhm 1 0402 Std Std 1 R8 Resistor 22 1kOhm 1 0402 Std Std 0 C1 C2 C4 C5 C6 C9 C10 C13 N C 0 R2 R9 R10 N C 0 L1 N C ...

Страница 5: ...05 JF EVB GUIDE REVISION HISTORY Date Revision Changes 2021 01 11 00 Issue initial preliminary EVB guide 2021 09 14 01 Modify the Bom list 2022 10 14 02 Modify the schematic and layout 2022 12 22 03 Modify the TABLE 2 ...

Отзывы: