12
Cyclone Insert Installation - English
Preparation for Installation
1. Unpack range hood and check contents. Note: Be cautious of
sharp edges within the unit.
2. Cut the insert cutout at the bottom of the cabinet using the
given cutout measurements on page 13 (Figure 1).
3. Locate the cutout at the center of the bottom of the cabinet.
Ensure that the front panel of the range hood is flush with the
surface of the cabinet doors.
SS130 INSERT HOOD INSTALLATION
This appliance requires 120V 60Hz electrical supply and
connection to an individual properly grounded branch circuit
protected by a circuit breaker or time delay fuse.
• Turn off power circuit at the service panel before wiring
this unit.
• All electrical work must be done by a qualified electrician
in accordance with all applicable codes and standards.
This range hood must be properly grounded.
WARNING
• At least two installers are required due to the weight and
size of the hood.
CAUTION
Figure 1.
1. Remove outer mesh filters of range hood
2. Attach damper to rectangular cutout on top of the range
hood using the screws provided.
3. Hold range hood upright, mesh filters facing down and
insert range hood upward into cabinet cutout. The range
hood mounts to the cabinetry by two spring loaded brackets,
one on each side of the range hood (Figure 2).
4. Once the range hood is through the cabinetry the brackets
should release. The brackets loosely hold the range hood in
place (Figure 3).
5. Pull the slide outwards to expose the inside of the range
hood. Locate the adjustable screw hole underneath both
sides of the hood.
6. Once located, use a Phillips screwdriver to tighten the
adjustable screw until the unit is tightly fastened to the base
of the cabinetry (Figure 4).
7. Make sure that the adapter is connected to ductwork.
8. Place mesh filters back into place.
9. Connect the power plug to the junction box.
Install the SS130 Range Hood
Figure 3.
Figure 2.
Fasten Screws
Figure 4.