background image

 
 

Bikehanger Assembly Instructions 

 
 

Step 

Action 

Parts 

Qty 

1  Insert Feet A and Feet B into Frame A.    

Side frame A 

 

Insert bolts and loosely tighten.  

Side frame B 

 

Mushroom head coach bolt faces internally on opening side of shelter. 

Feet A 

 

Mushroom head coach bolt faces externally on rear side of shelter. 

Feet B 

 

Repeat with Frame B. 

M10 x 65mm mushroom 
head coach bolt 

 

 

M10 shear nut 

 
 

 

 

 

 

 

2  Bolt Top Beam to Frame A and Frame B 

Top Beam 

 

Hand Tighten 

M10 x 30mm mushroom 
head coach bolt 

 

 

M10 serrated flange nut 

 
 

 

 

 

 

 

3  Bolt Bottom Beam to Frame A and Frame B 

Bottom Beam 

 

Bolt above plate 

M10 x 20mm hex bolt 

 

Hand Tighten 

M10 serrated flange nut 

 

 

 

 

Содержание Bikehanger

Страница 1: ...lter Feet A 2 Mushroom head coach bolt faces externally on rear side of shelter Feet B 2 Repeat with Frame B M10 x 65mm mushroom head coach bolt 4 M10 shear nut 4 2 Bolt Top Beam to Frame A and Frame B Top Beam 1 Hand Tighten M10 x 30mm mushroom head coach bolt 4 M10 serrated flange nut 4 3 Bolt Bottom Beam to Frame A and Frame B Bottom Beam 1 Bolt above plate M10 x 20mm hex bolt 2 Hand Tighten M1...

Страница 2: ...ange nut 2 5 Loosely bolt Roof Panel 4 to side frame to hold it in place Roof Panel 3 1 Hook Roof Panel 3 over Top Beam lip Roof Panel 4 1 Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame M8 x 20mm mushroom head coach bolt 24 Fix remaining bolts to panels and frame M8 serrated flange nut 24 M8 rubber washer 24 ...

Страница 3: ... mushroom head coach bolt 9 M10 serrated flange nut 9 8 Bolt High Wheel Holders to Bike Rack Beam A and Bike Rack Beam B High Wheel Holder 3 Hand Tighten M10 x 20mm mushroom head coach bolt 6 M10 serrated flange nut 6 9 Bolt Locking Bars to Bike Rack Beam A and Bike Rack Beam B Locking Bar 3 Tighten Shear Nuts until ends snap off M10 x 20mm mushroom head coach bolt 12 Lift up rack to tighten M10 s...

Страница 4: ...2 M10 serrated flange nut 2 11 Bolt Bike Rack Beam A and Bike Rack Beam B to Frame A and Frame B M10 x 20mm hex bolt 8 Hand Tighten M10 serrated flange nut 8 12 Bolt Joining Plate to Bottom Beam M10 x 20mm hex bolt 2 Hand Tighten M10 serrated flange nut 2 Tighten all bolts with impact wrench ...

Страница 5: ...rings to Frame A and Frame B Gas Spring 2 Note Connect piston rod end not cylinder end M10 Nylock nut 2 14 Bolt Door Hinges to Door Frame Door Frame 1 Nut on inside Door Hinge 2 M12 nylock nut 4 M12 x 30mm hex bolt 4 ...

Страница 6: ...15 Bolt Door Hinges to Top Beam M12 x 60mm A2 st st hex head bolt 45mm NOT thread 2 Apply grease to bolt M12 nylock nut 2 16 Bolt Gas Springs to Door Hinges through middle hole M10 Nylock nut 2 ...

Страница 7: ...t in place Roof Panel 1 1 Overlay Roof Panel 2 over Roof Panel 1 Roof Panel 2 1 Bolt Lock front cover to Locking box through frame M8 x 20mm mushroom head coach bolt 32 Fix remaining bolts to panels and frame M8 serrated flange nut 32 M8 rubber washer 32 ...

Страница 8: ...h Door Frame Locking Bar 2 Note Rotate locking bar to correct position Adjust length so end clears side frame by 5mm when open M12 nut 4 20 Attach Lock Handle to Lock Use loctite 21 Bolt External Handle to Door Frame External Handle 1 M10 serrated flange nut 2 22 Fix Nutserts to Door Frame M6 x 15mm Nutsert 10 23 Attach Lock Cover Plate to Door Frame Lock Cover Plate 1 M6 x 12mm button head socket...

Отзывы: