Commissioning the System
Commissioning the System
Turn the AC Switches to ON position.
CyboInverter should send test signals to the off-grid circuit to
assure that there are appropriate loads and there is no AC power.
If all is OK, CyboInverter will send power to the water heater.
Use an AC meter to check the voltage. 10V to 264V is normal.
Step 8. Commission the System
Inspection
Inspection
Make sure no wires are pinched or damaged and
the AC junction boxes are properly closed.
Only qualified personnel should perform this work.
Make sure the wiring to the electric water heater is
properly done.