Chapter 2
:
Installation
34
SE500
ULTRA
Hardware Manual
Wiring SE500
ULTRA
for Power
The SE500
ULTRA
must be hard-wired into your AC main power. Have a certified electrician to
wire the system.
➢
To connect AC power
1. On the rear of the machine, turn off the Main AC Circuit breaker.
2. Loosen and remove four screws on the power access cover to remove the cover.
3. Loosen the strain-relief nut at the bottom of the box.
Note:
Make sure the strain-relief nut is fully tightened.
Figure 20.
Rear Electrical Panel
Caution:
Before wiring the system, make sure that the AC main power supply is turned off and
locked off.
i
Note:
You must have a readily accessible power supply and a protective device in the fixed
wiring for the permanently-connected SE500
ULTRA
. The power supply, wiring, and any
protective device must be rated at 240 VAC, 10 amps or 110 VAC, 15 amps.
Power access cover
(Loosen) screws (x4)
(Loosen)
Strain relief nut
Main AC circuit breaker
Safety Labels
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...