Chapter 2
:
Installation
26
SE500
ULTRA
Hardware Manual
8. Lower the leveling feet sufficiently to allow the forks of a pallet jack or a forklift under the
machine.
9. Using a pallet jack or forklift, move the machine to a desired location.
10. Remove all the transit securing brackets on X and Y axes before using the machine.
Figure 10.
Transit securing brackets on X-Axis
Figure 11.
Transit securing bracket on Y Axis
Choosing a Location
The SE500
ULTRA
must be level and aligned with incoming and outgoing conveyor sections to
allow for smooth movement of panels.
Choose a location for the SE500
ULTRA
that meets the following requirements:
●
System has easy access to power and compressed air
●
Conveyor is level
●
Conveyor movement is smooth
●
System is not exposed to extreme ambient vibration
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...