CWS PoolNaturally Скачать руководство пользователя страница 4

© 2016 

Clear Water Supplies International Limited

 

Assembly and Use Instructions 

Read these instructions thoroughly prior to installation start. 

1. Gather recommended parts list or order installation kit. 

Lay out all parts in order of assembly 

2. Prepare by first applying Teflon tape (not supplied) 3 wraps around each threaded fitting. 

Assemble the inflow / outflow ports 

3. Verify that a plug is installed at the internal bypass port on the IN side of the dispenser, 

then,  using  typical  PVC  primer  and  glue  (not  supplied)  install  the  1 

½

  “x 

½

  “  SP  x  FT 

bushing (3) to the port labeled IN at the bottom of the contact chamber, then duplicate 
actions and install the second 1 

½

 “x 

½

 SP x FT bushing (3) to the port labeled OUT.  

4. Note: Allow sufficient dry (hardening time) consult your PVC glue container for directions. 
5. Assemble  one  each  of  the  (Teflon  taped) 

½

”  x  2 

½

  “nipples  (4)  and 

½

”  hose  barb 

adapters(6)  screwing each into opposite ends of one of the 

½

” FPT utility ball valves(5), 

Note: typical tightening is hand tight plus 1/3 turn with a wrench Do not over tighten.  

6. Screw this assembled nipple, valve, barb, assembly into the 1 

½

 “x 

½

 “ SP x FT bushing 

installed at   the bottom of the dispenser labeled IN. typical tightening is hand tight plus 
1/3 turn with a wrench  Do not over tighten. Make sure the valve handle is facing up or in 
a position where it can be easily reached after the completed installation. 

7. Repeat steps 5 and 6 to the OUT port of the contact chamber. 
8. Set contact chamber into its base(2). 
9. Optional  action:  You  may  choose  to:  turn  the  assembled  contact  chamber  and  base 

upside down and apply a bead of silicone caulking (not supplied) to the underside of the 
base  where  it  meets  the  chamber  housing;  this  will  create  a  more  solid  connection 
between these two parts, after the silicone hardens. 

10.   Set  unit  upright  and  place  it  at  a  convenient  location  among  the  pool  equipment, 

preferably on the equipment pad. Noting: unobstructed access to the contact chamber lid 
and utility ball valves, also note proper location of the IN and OUT ports.  Secure contact 
chamber base to the ground with cement screws, if possible. 
Connections to pool plumbing 
Prior to these next steps: be certain the pool equipment power is off and the utility ball 
valves (if any) are closed. 

Содержание PoolNaturally

Страница 1: ... 2016 Clear Water Supplies International Limited PoolNaturally Pure Simple Genius Installation and Product use Instructions In ground and above ground pools ...

Страница 2: ... 2016 Clear Water Supplies International Limited Recommended Flow Rate Minimum 2 gpm Maximum 10 gpm Installation Diagrams Installation can be done either before or after the pump Shown below ...

Страница 3: ... 2016 Clear Water Supplies International Limited ...

Страница 4: ...not over tighten 6 Screw this assembled nipple valve barb assembly into the 1 x SP x FT bushing installed at the bottom of the dispenser labeled IN typical tightening is hand tight plus 1 3 turn with a wrench Do not over tighten Make sure the valve handle is facing up or in a position where it can be easily reached after the completed installation 7 Repeat steps 5 and 6 to the OUT port of the cont...

Страница 5: ...mp and filter the other end to the barb fitting at the IN side of the contact chamber Now tighten the small hose clamps repeat actions from the OUT side of the contact chamber to outflow saddle assembly between the filter and heater or after the heater 19 Verify that the flow restrictor tube is upright and properly seated to the bottom center port of the contact chamber 20 Verify o ring is seated ...

Страница 6: ...ipes and pool surfaces it will collect on in filters and needs to be removed by rinsing or backwashing Routine Maintenance PoolMoss dosing has been designed for best results when PoolMoss is changed once a month see below for details about how to change PoolMoss Maintain 1 3 ppm of free chlorine Monitor pH alkalinity hardness and free chlorine weekly with test strips or other approved testing equi...

Страница 7: ...nd dispose Add new PoolMoss according to dosage chart below Lubricate o ring as needed Install the contact chamber lid and lock ring do not over tighten the lock ring and verify that the air relief vent is closed Open the previously closed inflow and outflow valves on the PoolStart contact chamber Slightly open the air relief valve on the cover and leave open until water flows out the contact cham...

Страница 8: ... 2016 Clear Water Supplies International Limited ...

Страница 9: ... or replacement product on future purchases or use of PoolNaturally products Limitation of Remedies Waiver and Release of Claims The PoolNaturally Refund Replacement Product Policy set forth above is the exclusive warranty and remedy for your use of any PoolNaturally product including without limitation to PoolNaturally PoolStart PoolMoss All claims for refunds are deemed waived or released unless...

Отзывы: