![Cutwater C-24 Coupe Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/cutwater/c-24-coupe/c-24-coupe_owners-manual_2701092016.webp)
STE
16
BATTERY CONFIGURATION
STE
2 House Batteries, 1 Engine Battery
1
1
2
3
3 bank battery charger
Ground/bonding bus
Solar controller (opt.)
30 Amp galvanic isolator (opt.)
Thruster battery switch
Thruster ANL fuse 200A
Solar controller panel (opt.)
STE
House, start, & battery parallel switches and breakers are located in the access
hatch beneath the stern sink.
1 Thruster Battery. Thruster battery, switch and ANL fuse are located in the forward
sink cabinet.
Once the EMERGENCY PARALLEL switch is placed in the on position the
power from the HOUSE batteries will be transferred to the ENGINE battery.
Use only for EMERGENCY starting of the engine.
If the house bank drops below 10.8v you must reset the charging relay by
switching on the parallel while the engine is running or while plugged into
shore power.
Battery Banks
1
= House
2
= Engine
3
= Thruster
O
OFF
EMERG
PARALLEL
O
OFF
HOUSE
+
-
O
OFF
ST
ART
+
-
O
OFF
HOUSE
+ -
—
ON
HOUSE
+
-
ON
OFF
VOLTAGE SENSOR RELAY
O
OFF
EMERG
PARALLEL
O
OFF
HOUSE
+
-
O
OFF
ST
ART
+
-
O
OFF
HOUSE
+ -
—
ON
HOUSE
+
-
ON
OFF
VOLTAGE SENSOR RELAY
100
House
30
24/7
Содержание C-24 Coupe
Страница 1: ...C 24 Center Walkaround Owner s Manual...
Страница 23: ...C 24 CW WORKING DECK STE 23...
Страница 27: ...WARNING LABEL LOCATIONS IN ENCLOSED HEAD IN ENCLOSED HEAD...