background image

Figure 6 illustrates the boom truss assembly.
Refer to the boom truss assembly parts list
for the hardware required. The XM520 uses
Phillystran® cable to guy the boom. The cable
is one continuous piece from one boom end
to the other. Note the Phillystran cable safety
loop that goes around the mast truss bracket.

Attach the truss bracket (91) to the mast 3 feet (1m) above the boom to
mast clamp using the 3/8" hardware provided.  Position the truss bracket
on the same side of the mast as the boom to mast clamp. Unscrew the
turnbuckle ends until there is 1/2" (1.2 cm) of thread remaining. Place
the jaw of each turnbuckle (23) into the holes of the truss bracket. Place
a thimble (59) on the eye of each turnbuckle. Place three loose cable
clamps (24) onto the cable end. Reference Figure 6 and place the cable
clamp saddle over the load bearing cable. The load bearing cable is the
cable that attaches to the boom end. Feed the cable through a turnbuckle
eye. Run the cable back through the cable clamps. Place three additional
cable clamps on the end of the cable. Feed the cable through the other
turnbuckle eye. Run the cable back through the cable clamps. Feed
enough cable through these parts until the center of the Phillystran cable
coil is located at the truss bracket. Insure there is enough slack in the
cable to form a loose safety loop between the turnbuckles. Tighten the
cable clamps beginning with the clamp closest to the thimble.

Refer to Figure 1E for attachment of the cable to the boom ends. Place a thimble (59) on the 1/4-20 x 1" bolt. Place three loose cable clamps
(24) onto the cable end. Feed the cable end through the element bracket and around the thimble. Run the cable back through the cable
clamps. Tighten the cable to remove the majority of the sag from the boom. Space the cable clamps 2 inches (5.1 cm) apart. Insure the load
bearing cable is seated in the cable clamp saddle as shown above. Tighten the cable clamps beginning with the clamp closest to the thimble.
Cut off excess cable 2” (5.1 cm) after the third cable clamp.

Adjust each turnbuckle to bring each boom end level with the center. Phillystran cable has a minimal amount of stretch over time. A safety
wire can be placed through the turnbuckle openings to keep the turnbuckles from unscrewing.

40

24

59

91

207

208

209

24

24

24

24

23

207

208

209

3209

23

2”

(5.1 CM)

SAFETY

LOOP

59

35

Figure 6

ID

Part #

Description

Dimensions

Qty

40

PS40

Phillystran

1/8” x 40’

1

Cable

(.3 x 10.7m)

24 024624

Cable

1/8”

12

Clamp

(.3 cm)

23 024623

Turnbuckle

5/16”-4”

2

(.79-10.2 cm)

91 194791

Truss

2” x 42” x 1/8”

1

Bracket

(5.1 x 10.2 x .3 cm)

35 170035

Aluminum

3-1/2”

1

V-Block

(8.9 cm)

59 024259

Thimble

1/8”

4

(.3 cm)

207 010207

SS Flat

3/8”

2

Washer

(.95 cm)

208 010208

SS Lock

3/8”

2

Washer

(.95 cm)

209 010209

SS Nut

3/8”

2

(.95 cm)

3209 013209

U-Bolt

2-7/8”

1

(7.3 cm)

6 - Boom Truss Assembly

XM520

10

Bottom of saddle

Load bearing
strand lays in

bottom of saddle.

Содержание BIG THUNDER XM520

Страница 1: ...XM520 20 METER 5 ELEMENT YAGI 951484 11 98 ASSEMBLY INSTALLATION COMMUNICATIONS ANTENNAS ...

Страница 2: ...OMMENDED THERE IS A WARNING STICKER WHICH MUST BE ATTACHED TO THE BOOM AS SHOWN IN FIGURE A Plan your installation carefully If you use volunteer helpers be sure that they are qualified to assist you Make certain that everyone involved understands that you are in charge and that they must follow your instructions If you have any doubts at all employ a professional antenna installation company to i...

Страница 3: ... 3 cm 8 ____ 024259 1 8 Cable Thimble 3 cm 4 ____ 024623 Turnbuckle 2 ____ 024624 1 8 Cable Clamp 3 cm 12 ____ 030407 5 8 Worm Clamp 1 6 cm 10 ____ 030409 11 16 Worm Clamp 1 7 cm 10 ____ 030410 1 Worm Clamp 2 5 cm 10 ____ 030411 1 1 8 Worm Clamp 2 9 cm 10 ____ 030412 1 1 2 Worm Clamp 3 8 cm 20 ____ 032881 2 1 16 3 Worm Clamp 5 2 7 6 cm 2 ____ 050077 3 8 Black Plastic Cap 0 9 cm 10 ____ 054526 2 1 ...

Страница 4: ...BD Aluminum 2 3 8 x 12 2 Tube 6 0 x 30 5 cm BE XM520BE Aluminum 2 3 8 x 60 1 Tube 6 0 x 152 4 cm BF XM520BF Aluminum 2 3 8 x 84 1 Tube 6 0 x 213 4 cm 19 010719 SS Hex 1 4 20 x 3 2 Bolt 7 6 26 054526 Black 2 1 2 2 Plastic Cap 6 3 cm 84 010084 SS Lock 1 4 2 Washer 99 014399 SS Lock 1 4 20 2 Nut 3 See Figure 1D Lay out boom sections as shown in Figure 1A Make sure tube ends are free of debris to allo...

Страница 5: ...0082 Hex 1 4 20 x 1 20 Bolt 6 x 2 5 cm 84 010084 SS Lock 1 4 28 Washer 6 cm 85 010085 SS Nut 1 4 20 10 6 cm 99 014399 SS Lock 1 4 28 Nut 6 cm ID Part Description Dimensions Qty 509 324509 Aluminum 4 x 5 1 4 x 3 16 10 Bracket 10 2 x 13 3 x 5 cm 588 014588 SS Hex 1 4 x 3 1 2 8 Bolt 6 x 10 2 cm 592 014592 SS Flat 1 4 1 8 thick 8 Washer 6 x 3 cm 4 Tighten LAST Tighten FIRST Tighten SECOND 99 84 588 99...

Страница 6: ...C ED EE EF EB EK EC ED EE EG EB EK EC ED EE EJ EB EK EH 32 81 3 cm 409 407 32 81 3 cm 36 91 4 cm 32 81 3 cm 32 81 3 cm 32 81 3 cm 409 407 32 81 3 cm 36 91 4 cm 32 81 3 cm 32 81 3 cm 32 81 3 cm 409 407 32 81 3 cm 40 101 6 cm 32 81 3 cm 32 81 3 cm 32 81 3 cm 409 407 32 81 3 cm 46 116 8 cm 32 81 3 cm 32 81 3 cm 20 50 8 cm 20 50 8 cm 20 50 8 cm 20 50 8 cm 411 32 81 3 cm 409 407 32 81 3 cm 23 58 4 cm 3...

Страница 7: ...10 Tube 2 2 2 5 x 91 4 cm ED X79ED Aluminum 5 8 3 4 x 36 10 Tube 1 6 1 9 x 91 4 cm EE X79EE Aluminum 1 2 x 36 10 Tube 1 3 x 91 4 cm EF X79EF Aluminum 3 8 x 48 6 Tube 9 x 121 9 cm EG XM520EG Aluminum 3 8 x 50 2 Tube 9 x 127 cm EH XM520EH Aluminum 1 3 8 x 24 4 Tube 3 5 x 61 0 cm EJ X79EJ Aluminum 3 8 x 32 2 Tube 9 x 81 3 cm EK XM520EK Aluminum 1 1 8 x 36 10 Tube 2 9 x 91 4 cm 120 6 XM520 Figure 2B 5...

Страница 8: ... 2 1 6 3 2 Clamp 5 2 7 6 cm 82 010082 SS Hex 1 4 20 x 1 20 Bolt 6 x 2 5 cm 84 010084 SS Lock 1 4 60 Washer 6 cm 87 014387 SS Lock 8 32 4 Nut 98 014498 Cush a 1 3 8 20 Clamp 3 5 cm 99 014399 SS Lock 1 4 60 Nut 6 cm 707 194707 U Channel 4 x 24 5 Bracket 10 2 x 61 cm MN MNXM Matching 1 Network FL XM520FL Aluminum 5 8 x 85 1 2 2 Strap 1 6 x 217 2 c m FS X79FS Copper 1 2 x 6 2 Braid 1 2 x 15 cm 87 81 8...

Страница 9: ...asher 6 cm 85 010085 SS Nut 1 4 20 1 6 cm 99 014399 SS Lock 1 4 20 2 Nut 6 cm 815 154815 Strap 2 x 1 1 2 x1 8 1 Insulator 5 1 x 3 8 x 3 cm 564 324564 Aluminum 1 x 5 1 4 x 1 8 2 Bracket 2 5 x 13 3 x 3 cm Figure 4A Element 3 Element 2 Element 4 Element 5 Element 1 8 XM520 815 FL 99 99 815 82 84 82 84 Figure 4C 82 84 82 84 85 564 Figure 4B ...

Страница 10: ...d 5B for assembly of boom to mast clamp Required hardware is listed in the Boom to Mast Clamp Assembly Parts List Form the boom shelf by attaching the lower boom bracket 506 to the mast plate 542 Attach mast plates 542 618 to mast using U bolts 3209 and V blocks 35 Place the boom on the boom shelf during installation Loosely attach the top boom bracket 506 to the mast plate 542 and to the lower bo...

Страница 11: ... the turnbuckles Tighten the cable clamps beginning with the clamp closest to the thimble Refer to Figure 1E for attachment of the cable to the boom ends Place a thimble 59 on the 1 4 20 x 1 bolt Place three loose cable clamps 24 onto the cable end Feed the cable end through the element bracket and around the thimble Run the cable back through the cable clamps Tighten the cable to remove the major...

Страница 12: ...representatives This warranty is in lieu of all other expressed warranties Any implied warranty is limited in duration to one year Cushcraft Corporation shall not be liable for any incidental or consequential damages which may result from a defect Some states do not allow a limitation on how long an implied warranty lasts or exclusions or limitations of incidental or consequential damages so the a...

Отзывы: