9
010009
SS MACHINE
8-32 x 5/8"
3
SCREW
(1.6 cm)
11
010011
SS
8-32
7
HEX NUT
23
190023
CONNECTOR
(SHORT)
1
BRACKET
26
190026
ALUMINUM
7/8"
2
BRACKET
(2.2 cm)
41
011941
SS LOCK
#8
7
WASHER
43
190043
CONNECTOR
(LONG)
1
BRACKET
53
050053
PLASTIC
1/2"
4
CAP
(1.3 cm)
#2 - REDDI-MATCH ASSEMBLY
Assemble the driven element tubes (EC &
ED) and connector brackets (23 & 43) to the
boom at the positions shown in figure D
using the hardware shown in figure B. Note
that both connectors point towards the back
of the boom. Attach the Reddi-Match sub-
assemblies starting with element EC.
Loosely attach the tuning strap (125) to the
driven element (EC) as shown. Slide the
longer Reddi-Match sub-assembly (RM1)
through the Reddi-Match straps and secure
to the connector using washer (41) and nut
(11). Set the distance between the connec-
tor bracket (43) and the strap (125) as
shown in figure B and tighten the hardware.
Attach the other Reddi Match sub-assembly
(RM2) to the other driven element (ED)
using washer (41) and nut (11). Be sure to
set the Reddi-Match strap dimension
shown in figure B. Install end caps (53) on
ends of elements EC and ED.
A270-6S
FIGURE B
120
010120
SS MACHINE
8-32 x 2"
2
SCREW
(5.1 cm)
125
200125
TUNING
1
STRAP
921
200921
TUNING
2
STRAP
941
360941
ALU FLAT
#8
2
WASHER
EC
ALUMINUM
1/2" x 38"
1
TUBE
(1.3 x 96.5 cm)
ED
ALUMINUM
1/2" x 12-7/16"
1
TUBE
(1.3 x 31.6 cm)
RM1
REDDI-MATCH
5-1/2"
1
(2 Meter)
(14.0 cm))
RM2
REDDI-MATCH
3-3/8"
1
(70 cm)
(8.6 cm)
KEY P/N DISPLAY DESC SIZE QTY
KEY P/N DISPLAY DESC SIZE QTY
3
1-5/8"
(4.13 cm)
Back
53
EC
26
120
43
41
11
41
11
41
11
125
9
RM1
26
941
9
41
11
23
(SHORT)
941
41
11
11
41
9
53
53
53
120
921
(LONG)
RM2
7/8"
(2.22 cm)
ED