
of 10
Final Frame Assembly
8
10
11
centerline
12
Step 12
Sides
Eyelet
Step 11
Corners
The roof awning fabric is attached to the structure with the
hooks
provided. The hooks are inserted and
[MISC K.PL106]
secured in place in the beam slots as shown in the diagram
below. Install first two hooks in each corners (Step 11) then
work your way around the sides installing hooks between
each eyelets (Step 12). Once all the hooks are positioned
correctly secure them to the beams with the self-tapping
screws
(Step 12 View F-F).
[MISC 054]
B1
Complete securing the awning fabric to the structure by installing
remaining hooks
on all fours sides as shown in the
[MISC K.PL106]
diagram. Work your way progressively around the structure to produce an
even tension in the elastic.
View F-F
F-F
B2
K.PL106
K.PL106
054
Place the nylon webbing over
the beam corner and under the elastic
B1
B2
K.PL106
When installing the roof cover and hooks
at each corner make sure that the nylon webbing from
[MISC K.PL106]
the roof cover, elastic and hooks are placed as shown in the left diagram above. This step will ensure that the
elastic remains in position when tension is applied. Once the roof cover is in place, verify that its corner is aligned
with the corner of the structure as shown in the right diagram above.
Model # Pavillion 1.0
Distributor: ShadeScapes Americas
970.527.7070
cuscini.shadescapesamericas.com