User Guide
DDOC0099-000-AH
DTS1 CSfC
B - 5
Connectors / Cables
© 2020 Curtiss-Wright Defense Solutions
Revision 2.0
Figure B.6
Ethernet Lab Cable Wiring Diagram
B.4
Ground Lug
A ground cable is required, but not provided. The ground cable is installed on the DTS1 ground lug
E1. The provided nut should be torqued to 18 in. lb. to ensure proper connection.
DDOC0099-0038
2
1
3
4
5
6
8
9
10
11
19 18
13
14
15
17
12
16
7
P2
6
5
4
3
2
1
12
11
10
9
8
7
13
19
18
17
16
15
14
C2
B2
A2
D2
ETHERNET
P1