READY TO BREW
12
12
12
12
F U L L
BREW
12
12
12
HALF
BREW
I / O
ON/OFF
HOT
WATER
~ ~ ~
STEPS TO
PROGRAMMING
Your Curtis ADS System is Factory Pre-Set for Optimum Performance. Generally, There Will Not be a
Need to Change Programming.
HOT WATER Dispense Button (Orange)
READY TO BREW Indicator Light (Red)
ON/OFF Button (Yellow)
FULL BREW Button (Green)
HALF BREW Button (Green)
CHANGING THE DELTA FEATURE
ENTER THE PROGRAMMING MODE #3:
!
Press and HOLD until
shows one quick flash, then RELEASE. You have now added a blink to your
blinking light pattern.
!
By pressing and holding
you add another blink.
READY TO BREW
Changing the ADS System Program
Your ADS System features a dynamic memory. In the event of a power loss, it will remember ALL program settings.
Brew Temperature – Factory Pre-Set to 200°F
Function to set brew temperature, 170° to 204°F. Brew temperature will be indicated by READY-TO-BREW light blinking.
ENTER THE PROGRAMMING MODE #1:
!
Press
for two seconds, then RELEASE.
!
will start blinking. Each blink equals 2º F, starting at 170º (max. temp. 204º F or 18 blinks).
!
To change Temperature, press and HOLD
.
.
!
will start QUICK flashing. Each QUICK flash equals 2º F.
After reaching 204º, temperature starts over at 170º.
!
RELEASE when the desired temperature is reached (new temp. will now be displayed).
To set and exit, press .
CONFIRM/RESET BREW TEMPERATURE - Factory Preset to 200º
READY TO BREW
READY TO BREW
For ALL functions you must first enter the programming mode.
!
Turn OFF the power from the Control Panel by pressing .
!
Press and HOLD and press and RELEASE .
!
Continue HOLDING
until
starts blinking; RELEASE.
ENTERING THE PROGRAM MODE #1
READY TO BREW
!
Turn OFF the power from the Control Panel by pressing .
!
Press and HOLD and press and RELEASE .
!
Continue HOLDING until
STOPS blinking and remains on, then
RELEASE.
!
will now blink a pattern of flashes from one to three.
ENTER THE PROGRAM MODE #3
READY TO BREW
READY TO BREW
WARNING: Steps involve working
with hot water. Scalding may
occur. Take care against spilling.
The Half Brew button
is always half of the brewtime of the setting of the Full Brew button. You cannot program the Half Brew.
Change the brew volume of your ADS System by following these steps.
Before changing the brew volume, wait until unit reaches brew temperature (Ready to Brew
light comes on), insert the brewcone into place on the brewer, then place a measuring
container centered beneath the brewcone.
Brew Volume - Factory Pre-set Full Brew to 2.2 Liters
ENTER THE PROGRAMMING MODE #1 (Be sure to have brewcone & airpot in position).
!
Press and HOLD until hot water starts running from sprayhead; then RELEASE.
!
When desired volume is reached, press
again to stop flow.
!
To set and exit, press .
CHANGE BREW VOLUME
(When programming the brewer for volume, it is
important to realize that after you program the
unit, it must reach full brew temperature before it
will allow you to brew.)
BREW CYCLE COUNTER
TO ACCESS BREW CYCLE COUNTER
ENTER THE PROGRAMMING MODE #2:
!
will now start a pattern of LONG and SHORT blinks.
This pattern identifies the number of brew cycles. SHORT blinks indicate the brew number from one [1] to
nine [9]. LONG blinks separate the 1’s, 10’s, 1,000’s and 10,000’s.
READY TO BREW
!
Turn OFF the power from the Control Panel by pressing .
!
Press and HOLD and press and RELEASE .
!
Continue HOLDING until
STOPS blinking; RELEASE.
ENTER THE PROGRAM MODE #2
READY TO BREW
DELTA 1 (this is factory setting) allows you to brew within 5 degrees from set temperature. This provides for consistent brew temperature and consistent water density. If Delta 1 is used, run half brew first,
discard water. Program to ½" below collar of airpot (one small finger width).
DELTA 2 allows you to brew within 10 degrees from set temperature. If Delta 2 is used, run half brew first and discard water. Program to ¾" below collar of airpot (between one and two small finger widths).
DELTA 3 will allow you to brew at any temperature. Back to back brewing is only possible in this mode (120V). If Delta 3 is used, run half brew first and discard water. Program to 1” below collar of airpot (two small
finger widths). The brew cone must be empty without a filter. This will ensure proper operation at all brew rates.
During back to back brew cycles the water temperature in the tank will start to drop, as these brew cycles increase the water gets cooler. With cooler water in the tank the density changes and the flow rate will
increase. Typically an increased flow rate may translate in to a maximum increase of 4 ounces in the airpot.
LOW TEMPERATURE BREW LOCKOUT (Delta) - Factory Preset to Delta 1