background image

READY TO BREW

12

12

12

12

F U L L

BREW

12

12

12

HALF

BREW

I / O

ON/OFF

HOT

WATER

~ ~ ~

STEPS TO
PROGRAMMING

Your Curtis ADS System is Factory Pre-Set for Optimum Performance. Generally, There Will Not be a
Need to Change Programming.

HOT WATER Dispense Button (Orange)

READY TO BREW Indicator Light (Red)

ON/OFF Button (Yellow)

FULL BREW Button (Green)

HALF BREW Button (Green)

CHANGING THE DELTA FEATURE

ENTER THE PROGRAMMING MODE #3:

!

 Press and HOLD               until

  shows one quick flash, then RELEASE. You have now added a blink to your

blinking light pattern.

!

 By pressing and holding

      you add another blink.

READY TO BREW

Changing the ADS System Program

Your ADS System features a dynamic memory. In the event of a power loss, it will remember ALL program settings.

Brew Temperature – Factory Pre-Set to 200°F

Function to set brew temperature, 170° to 204°F. Brew temperature will be indicated by READY-TO-BREW light blinking.

ENTER THE PROGRAMMING MODE #1:

!

 Press

for two seconds, then RELEASE.

!

will start blinking. Each blink equals 2º F, starting at 170º (max. temp. 204º F or 18 blinks).

!

 To  change Temperature,  press  and  HOLD

      .

.

!

will start QUICK flashing. Each QUICK flash equals 2º F.

   After reaching 204º, temperature starts over at 170º.

!

 RELEASE              when the desired temperature is reached (new temp. will now be displayed).

  To set and exit, press             .

CONFIRM/RESET BREW TEMPERATURE - Factory Preset to 200º

READY TO BREW

READY TO BREW

For ALL functions you must first enter the programming mode.

!

 Turn OFF the power from the Control Panel by pressing            .

!

 Press and HOLD             and press and RELEASE            .

!

 Continue HOLDING

until

starts blinking; RELEASE.

ENTERING THE PROGRAM MODE #1

READY TO BREW

!

 Turn OFF the power from the Control Panel by pressing             .

!

 Press and HOLD               and press and RELEASE             .

!

 Continue HOLDING              until

STOPS blinking and remains on, then

   RELEASE.

!

will now blink a pattern of flashes from one to three.

ENTER THE PROGRAM MODE #3

READY TO BREW

READY TO BREW

WARNING: Steps involve working
with hot water. Scalding may
occur. Take care against spilling.

The Half Brew button

is always half of the brewtime of the setting of the Full Brew button. You cannot program the Half Brew.

Change the brew volume of your ADS System by following these steps.

Before changing the brew volume, wait until unit reaches brew temperature (Ready to Brew
light comes on), insert the brewcone into place on the brewer, then place a measuring
container centered beneath the brewcone.

Brew Volume - Factory Pre-set Full Brew to 2.2 Liters

ENTER THE PROGRAMMING MODE #1 (Be sure to have brewcone & airpot in position).

!

 Press and HOLD              until hot water starts running from sprayhead; then RELEASE.

!

 When desired volume is reached, press

  again to stop flow.

!

 To set and exit, press            .

CHANGE BREW VOLUME

(When programming the brewer for volume, it is
important to realize that after you program the
unit, it must reach full brew temperature before it
will allow you to brew.)

BREW CYCLE COUNTER

TO ACCESS BREW CYCLE COUNTER

ENTER THE PROGRAMMING MODE #2:

!

  will now start a pattern of LONG and SHORT blinks.

This pattern identifies the number of brew cycles. SHORT blinks indicate the brew number from one [1] to
nine [9]. LONG blinks separate the 1’s, 10’s, 1,000’s and 10,000’s.

READY TO BREW

!

 Turn OFF the power from the Control Panel by pressing             .

!

 Press and HOLD               and press and RELEASE             .

!

 Continue HOLDING              until

STOPS blinking;  RELEASE.

ENTER THE PROGRAM MODE #2

READY TO BREW

DELTA 1 (this is factory setting) allows you to brew within 5 degrees from set temperature. This provides for consistent brew temperature and consistent water density. If Delta 1 is used, run half brew first,

discard water. Program to ½" below collar of airpot (one small finger width).

DELTA 2 allows you to brew within 10 degrees from set temperature. If Delta 2 is used, run half brew first and discard water. Program to ¾" below collar of airpot (between one and two small finger widths).
DELTA 3 will allow you to brew at any temperature. Back to back brewing is only possible in this mode (120V). If Delta 3 is used, run half brew first and discard water. Program to 1” below collar of  airpot (two small

finger widths). The brew cone must be empty without a filter. This will ensure proper operation at all brew rates.
During back to back brew cycles the water temperature in the tank will start to drop, as these brew cycles increase the water gets cooler. With cooler water in the tank the density changes and the flow rate will
increase. Typically an increased flow rate may translate in to a maximum increase of 4 ounces in the airpot.

LOW TEMPERATURE BREW LOCKOUT (Delta) - Factory Preset to Delta 1

Содержание TLP10

Страница 1: ... TLP20 TLP30 TLP61 NOT UL LISTED FIND OUT MORE ON THE WEB WILBURCURTIS COM WILBUR CURTIS COMPANY Montebello CA 90640 DRAFT COPY Not Released This Version Exists as File No I DIAGRAMS FRANK FX 134 p65 DIGITALAIRPOT BREWING SYSTEM FOR THE LATEST SPEC INFORMATION GO TO WWW WILBURCURTIS COM ISO 9001 REGISTERED C TLP ...

Страница 2: ... level in the tank rises to the correct volume the heating elements will energize automatically With ADS Systems there is no danger of element burnout caused by an empty tank 4 Turn on the control panel by pressing the ON OFF button 5 The heating tank will require 20 to 30 minutes to reach operating temperature 200 F as indicated by the READY TO BREW indicator 6 Prior to brewing dispense 12 ounces...

Страница 3: ... these steps Before changing the brew volume wait until unit reaches brew temperature Ready to Brew light comes on insert the brewcone into place on the brewer then place a measuring container centered beneath the brewcone Brew Volume Factory Pre set Full Brew to 2 2 Liters ENTER THE PROGRAMMING MODE 1 Be sure to have brewcone airpot in position Press and HOLD until hot water starts running from s...

Страница 4: ... 20 15 61 13A WC 860 VALVE LIQUID DISPENSING LEFT 220VAC 12W MODEL 30 14 WC 5231 COMPOUND SILICONE 5 OZ TUBE 15 WC 3503 LEG SCREW BUMPER 3 8 16 STUD 16 WC 102 SWITCH TOGGLE SPST 25A 250VAC RESISTIVE Models 10 20 16A WC 103 SWITCH TOGGLE DPST 25A 125 250 VAC RESISTIVE Models 15 30 61 17 WC 826 VALVE INLET 1 15 GPM 120V 10W Models 10 20 15 61 17A WC 856 VALVE INLET 1 15 GPM 240V 10W Model 30 18 WC 5...

Страница 5: ... by a professional certified technician and must comply with all local electrical mechanical and plumbing codes 3 Wilbur Curtis Company will not be responsible for the operation of equipment at other than the stated voltages on the serial plate 4 Abuse or neglect including failure to periodically clean or remove lime accumulations Manufacturer is not responsible for variation in equipment operatio...

Отзывы: