Connecting the Water Supply
9 Flush the water supply line prior to installation to purge
BJSBOEEFCSJTGSPNUIFXBUFSmMUFSBOEUVCJOH
10
$POOFDUUIFXBUFSTVQQMZMJOFUPUIFnBSFmUUJOHPO
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Powering Up the Brewer
Brewers With A Cord Set Attached
11 On brewers with a cord set attached, connect the
power cord to the appropriate electrical outlet.
12 Make sure that the circuit breaker supplying power to
the brewer is on.
13 Turn on the water supply valve.
14 Turn the toggle switch on the back of the brewer to the
0/QPTJUJPO5IFXBUFSUBOLXJMMTUBSUUPmMM8IJMFUIF
UBOLJTmMMJOHJOTQFDUUIFXBUFSTVQQMZMJOFGPSMFBLT
15 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
When the water has heated,
Ready to brew
will be
displayed on the LCD screen.
16 Perform a brew cycle of a least 12 oz./350 ml to purge
any remaining air from the system. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
INSTALLATION INSTRUCTIONS
II17
BREWERS, REAR COVER, INSTALLATION INSTRUCTIONS
092519C
WARNING:
Connect the power cord only to the
appropriate type and size electrical outlet. If the
electrical outlet is not compatible with the power
cord, have it upgraded by a licensed electrician. Do
not modify the power plug. Do not use an extension
cord. Do not use a power cord/plug that is damaged.
IMPORTANT:
When operating the brewer at
higher elevations, reduce the factory set operating
temperature (200°F.92°C) by 2°F/1°C for each
1000 ft. (300 m) of elevation above 4000 ft
(1200 m). See
PROGRAMMING GUIDE
section.
Содержание G3 D60 Series
Страница 22: ...ELECTRICAL SCHEMATICS ES58 53 4 5 D60GT12...