
Figure 1-A
Figure 1-C
Figure 1-E
Figure 1-F
Figure 1-G
Figure 1-B
Figure 1-D
Figure 1
Step 1
Bolt the arm extensions (#3) to the arm post (#1) using the
carriage bolt kit (#8). See figure 1-A. Raise the arms to
the outright position and secure with the attached lynch pin.
See figure 1-B.
Step 2
Connect the arm post (#1) and the connecting
post (#2) using bolt kit (#7). See figure 1-C.
Step 3
Turn the knob on the bottom of the towable shank
counter clockwise to allow the connecting
post (#1) into the shank (#4). See figure 1-D.
A
B
C
E
D
ASSEMBLY
Step 4
Using the hex head bolt kit (#6), attach the bottom
of the connecting post (#2) to the shank (#4). Make sure
to install the bolt in the bottom hole. See figure 1-E. Insert the
bolt that is connected to the post through the top hole of the
shank and secure with the provided clip. See figure 1-F.
Step 5
Turn the knob on the bottom of the towable shank
clockwise to lock the connecting post (#1) into the
shank (#4). See figure 1-G.
CURTMFG.COM •
NEED ASSISTANCE? • 1.800.798.0813 • 18031-INS-RB • PAGE 2