![Curb Roller Manufacturing BATT Screed 6000 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/curb-roller-manufacturing/batt-screed-6000/batt-screed-6000_owners-manual_2698517005.webp)
After the tube has been attached
to both handles, install the battery.
With both operators holding firmly
on the handles lightly pull the
variable speed trigger to see which
direction the pipe turns. The pipe
should roll away from the operators
for proper operation. If the pipe
rolls towards the operators, simply
change the rotation of the pipe by
pushing the directional button on
the side of the machine.
Cleanup and Maintenance
Excessive wet concrete may be
removed with a rag, wire, or bristle
brush.
Dry concrete may be gently
removed using a scraper or similar
tool.
Curb Roller Mfg. recommends
removing the expandable pipe
inserts after each pour and storing
them in the non-compressed
position. It is also recommended
to remove the bolts from the ends
and re-apply a coat of anti-seize on
them at least once a year.
Troubleshooting
Trigger Sticks
Check bolt on handle and loosen
nylon nut if necessary.
Check slide for concrete build up.
Linkage may be bent and binding.
Содержание BATT Screed 6000
Страница 1: ...www curbroller com 785 467 3132 MODEL 6000 OWNER S MANUAL...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 15: ......
Страница 16: ...Curb Roller Mfg 112 South Main Street Fairview KS 66425 Patent Pending May 2019...