3
System Start-Up
1) Remove the prefilter cartridge from its
packaging. Remove the red cap from the
cartridge and moisten the o-rings with water.
Insert the cartridge into the filter head. Be sure
that the ears on the cartridge line up with the
spaces in the head. Then, turn the cartridge
1/4 turn to the right.
Note: Be sure to install the cartridge into the
proper head by matching the icon on the
cartridge label with the icon on the head.
2) Check that all plumbing connections are
secure.
3) Open the tank shut-off valve and inlet water
valve. Turn on the incoming water supply or
beverage booster pump (if applicable) and
check the system for leaks. If any leaks are
noted, turn off the water supply and/or booster
pump and correct the leak before proceeding.
If a leak is detected at a push-in fitting, refer to
Figure 2.
4) Divert the Water Sample Valve outlet to drain.
Open valve and let water run through the RO
to drain for 10 minutes.
5) Close sample valve.
6) Allow tank to fill (Approximately 60 minutes).
7) Open Water Sample Valve outlet to drain.
Empty tank. Water flowing from tank will
reduce to a fast drip when tank is empty.
8) Allow product water to run to drain for 60
minutes.
9) Close sample valve and allow the tank to fill
(Approximately 60 minutes).
How to Use ‘Push-In’ Connectors (Figure 2)
1
Push in collet to release tubing.
2
Tubing is secured in.
Grey Collet
Tube
O-Ring
Push tubing straight in as far as it will go.
1
Pull tubing straight out.
2
To Attach Tubing
To Release Tubing
This product is outfitted with user friendly ‘Push In’ connectors. Proper use of the connectors
is shown in the diagrams. It is most important that the tubing selected for use with these
connectors be of high quality, exact size and roundness, and with no surface nicks or
scratches. If it is necessary to cut the tubing, use a plastic tubing cutter or sharp razor knife.
Make a clean square cut.
Should a leak occur at a ‘Push-In’ connector, the cause is usually defective tubing.
To Fix:
1. Relieve pressure
2. Release tubing
3. Cut off at least 1/4” from end
4. Reattach tubing
5. Confirm connection is leak free
Содержание SCALEGARD SGLP-RO
Страница 11: ...7 000 450 750 ...