Framings for System on Brackets and System on Concrete
1. Refer to the
or
for the framing dimensions to install the
pads.
2. Make opening in wall equal to the length and height of the pad.
3. Frame the opening with treated lumber as shown in
. Make sure the boards are
level and flush with the front side of the posts as shown.
NOTE:
• Use steel equivalent to frame opening if installing Unitized System to steel building.
• In-line pump location will vary depending on setup option.
Filler Boards
1. 2" x 6" and 2" x 4" filler boards (22 and 23) are necessary to secure the top flashing to the wall.
2. 2" x 8" and 2" x 6" filler boards (25 and 22) are necessary to secure the bottom flashing to the wall.
3. The bottom flashing serves as a splash-guard and fills the gap for improved air flow.
4. Two 2" x 6" filler boards (22) are necessary to secure the top brackets for sidewall curtain assembly.
NOTE:
Two pads available with 4', 5' or 6' heights. Only use 6" thick pads for square bottom system.
Figure 3-3
Framing for system on brackets and system on concrete
22
2" x 6" filler boards (or steel equivalent) (2)
25
2" x 8" filler board (or steel equivalent)
23
2" x 4" filler board (or steel equivalent)
26
Center the end of the first 2" x 4" and the last
2" x 4" on the 4" x 4" post
24
4" x 4" post (or steel equivalent)
27
2" x 4" header board
16
4801-5405
Unitized System Komfort Kool