6
S
ection
2 — A
SSembly
& S
et
-U
p
Chute Assembly Options
Refer to Figure 2-7 and proceed to your applicable Chute Control Style on pages 7-11.
Overhead Chute Control
(w/ Flex Shaft Steel Chute) Page 10
Electric Chute Control
Pages 11
Chute
Assembly
Chute
Assembly
Flex
Shaft
2-Way & 4-Way Chute Control
Page 9
Overhead Chute Control
(w/ Chute Control Rod) Page 8
Standard Side Crank Chute Control
Page 7
Standard Side Crank
Rod Assembly
Overhead Chute
Control Rod
Chute Control
Rod
Chute
Assembly
Chute
Assembly
Chute
Assembly
Chute Control
Rods
Figure 2-7
(c)
(c)
(b)
(b)
(a)
(a)
Figure 2-5
(c)
(c)
(a)
(a)
(b)
(b)
Figure 2-6
STOP
Refer to “Figure 2-7” on page 6 to identify your
applicable chute style and continue to Chute Assembly
Options (page 6).
3.
Place shift lever in Forward-6 position or
fastest forward speed (if equipped).
4.
Observe lower rear area of equipment
to be sure both cables (if equipped) are
aligned and seated properly in roller
guides. See Figure 2-3.
NOTE:
On select units, chute-pitch control
cables will be routed under the engine on the
left side and will not use roller guides.
Figure 2-3
5.
Pivot handle upward and align the lower
handle. See Figure 2-4. Remove and
discard any rubber bands, if present.
They are for packaging purposes only.
Figure 2-4
NOTE:
On select units with steel rod
speed selectors, you may need to lower
shift rod to the side slightly to maneuver
handle panel over it when pivoting
handle upward.
6.
Attach the two carriage screws (b)
and nuts (a) removed in Step 2. Finish
securing the handle by tightening the
top two nuts (c) loosened in Step 2. See
Figure 2-5 or Figure 2-6 for units with
side supports.