To place the new belt, begin by routing the belt around the
5.
two outer spindle pulleys, then around the front spindle
pulley as shown in Fig. 7-8.
Then route the belt around the two deck idler pulleys as
6.
shown in Fig. 7-8.
Retighten the belt keeper rod loosened earlier.
7.
Remount the belt guards removed earlier.
8.
Re-install the deck making sure the belt remains routed
9.
around the pulleys as instructed.
Pull the right side of the belt and place the narrow V side of
10.
the belt into the PTO pulley. See Fig. 7-9.
While holding the belt and pulley together, rotate the
11.
pulley to the left (See Fig. 7-9). Continue holding and
rotating the pulley and belt until the belt is fully rolled into
the PTO pulley.
Outer Spindle
Pulleys
Front Spindle
Pulley
Deck Idler
Pulleys
Figure 7-8
PTO Belt
Rotate
Pulley
Figure 7-9
28
s
ectiOn
7— s
ervice
Содержание 13AF91AP010
Страница 33: ...Notes 11 33 ...