Sensor can be response tested and/or span calibrated immediately after 

power up. Allow 60 seconds for power up time delay of sensor to end (green 

power LED will flash during power up).

Once the unit is powered up, the SD2-NH3 starts the 10-minute sampling 

rate, and the sample-draw cycle is as follows:

•  2-minute sample tube drying cycle.
• 

2-minute sample time from the room being monitored.  At the end of the 

two minutes, the sample data is stored and held for the next 10 minutes 

also while being transmitted via 4-20 mA output to the controller or PLC.

• 

2-minute fresh air purge from outside fresh air source.

• 

4-minute pump shut-off phase.

LED Functions 

(see Figure 3 on page 8)

Calibration

The SD2-NH3 sensor comes factory calibrated and should require only 

minimal adjustment after installation. There are two pots on the preamp 

that are used for calibration (see Figure 3).

Note:

 Never measure sensor output in mA. Always use mVDC or VDC 

voltmeter settings.

Bottom back board calibration mode: 

Since the sample data is stored and held for 10 minutes during the sample-

draw cycle, the real-time 4-20mA signal is only accessible on the upper 

testpoints. Follow this procedure to output the real-time 4-20mA signal on 

the lower testpoints.

1. 

Locate zero adjustment pot on sensor backboard.  It can be found on 

the left side below the pump and status LEDs. (see Figure 3)

2. 

Turn pot 1/4 turn clockwise and back again. Successful entry into 

calibration mode will be indicated by the Power (green) LED blinking 

twice per second and the real-time signal is now active and can be 

viewed on connected monitoring equipment or voltmeter connected to 

the lower testpoints.  Real-time mode will time out after 4 minutes.

Zero Calibration:

 After the sensor is installed and has been powered up for 

a minimum of 8 hours, the unit can be zero calibrated by the following:

Note:

 Place bottom back board in calibration mode and connect voltmeter 

to lower testpoints (see Figure 3).

1. 

Remove the ammonia cell from the aluminum housing. Wiggle cell back 

and forth while pulling upwards (see Figure 3).

2.  Be sure the unit is in clean air.
3.  Adjust the zero pot on the bottom back board until the sensor outputs 

40 mV from Test [-] to Test [+] (see Figure 3). 

Note:

 To zero the sensor 

immediately after power up or cell replacement, unplug cell from the 

transmitter and adjust signal to 40 mV.

Span Calibration

: DO NOT ADJUST THE SPAN POT WITHOUT CERTIFIED 

CALIBRATION GAS! If span adjustment is required, use this procedure:

Note:

 Place bottom back board in calibration mode and connect voltmeter 

to lower testpoints (see Figure 3).

1. 

Remove the ammonia cell from the aluminum housing. Wiggle cell back 

and forth while pulling upwards (see Figure 3).

2.  Apply span gas at 0.5 to 0.8 L/min (span gas must be in air, not nitrogen 

or other carrier).

3.  Sensor should react to gas within 15 seconds.
4.  Once the output signal has peaked (or 2 minutes maximum) adjust the 

Span pot on the top sensor board until the correct output is achieved 

(see Figure 3). With full-scale span gas, the calculated span value is 200 

mV. ((span gas / sensor range * 16 + 4) (

mA output)

)

5.  Reinsert ammonia cell back into its aluminum housing.  Press 

downwards firmly until it snaps into place.

Note: Below are a few response characteristics which may be an indication 

that the gas sensor is at or near the end of its useful life. If any of these 

characteristics are observed, the cell should be replaced.

• 

Slow response to / recovery from calibration gas.

• 

Failure of the output to reach 50% of the calibration gas value prior to 

span adjustment.

•  Unable to achieve correct output during span.

Содержание SD2-NH3

Страница 1: ...Installation and Operation Manual SD2 NH3 SAMPLE DRAW AMMONIA SENSOR FOR CONTROLLED ATMOSPHERE ROOMS...

Страница 2: ...nly in the manner described in this manual If the equipment is used in a manner not specified by Calibration Technologies the protection provided by the equipment may be impaired This equipment should...

Страница 3: ...wy Columbia MO 65201 phone 866 394 5861 email sales ctiengineeing com website ctiengineering com General description 4 Installation 4 Locating the SD1 NH3 4 Installation guidelines 4 Fresh air port in...

Страница 4: ...sealed in potting compound protecting sensitive electronic components and copper tracing from corrosion An external fresh air sample tube and hardware are included with the SD2 NH3 Tube length provide...

Страница 5: ...conduit to the conduit body A 5 Attach the conduit body A to the sample air inlet port B at the bottom of the sensor enclosure 6 Take the finished subassembly and line up the 1 2 conduit with the 1 2...

Страница 6: ...ays use 3 conductor insulated stranded shielded copper cable Do not pull sensor wiring with AC power cables This can cause electrical interference If cable runs cannot be made without a splice all spl...

Страница 7: ...out after 4 minutes Zero Calibration After the sensor is installed and has been powered up for a minimum of 8 hours the unit can be zero calibrated by the following Note Place bottom back board in ca...

Страница 8: ...eady to Indicate Power Blinks once per second for 60 seconds during power up Blinks once per second continuously if supply voltage is too low Figure 3 Zero adjustment Bottom back board Status amber LE...

Страница 9: ...CTI All calibrations should be logged During every calibration interval disassemble the inlet filters and clean with compressed air Always disconnect power at the controller before performing any wiri...

Страница 10: ...ft Application dependent but generally less than 3 per month Linearity 0 5 of full scale Repeatability 1 of full scale Wiring Connections 3 conductor shielded stranded 18 AWG cable General Cable C2535...

Страница 11: ...uct by any person other than an authorized dealer or contractor or the installation of unapproved parts on the product The obligations set forth in this warranty are conditional on a proper storage in...

Страница 12: ...ctiengineering com 866 394 5861 SD2 NH3 DOC1 2 20200923...

Отзывы: