35
CTC EcoPart 400
General information
8. First start
1.
Check that the heating boiler and system are full of water and have
been bled.
2.
Check that all connections are tight.
3.
Check that sensors and the radiator pump are connected to the
power source.
4.
Energise the heat pump by switching on the safety switch (the main
switch).
Once the system has heated up, check that all connections are tight, the
various systems have been bled, heat is coming out into the system and
warm water is coming out at the tap locations.
Содержание EcoPart 400 230V 1N~
Страница 7: ...7 CTC EcoPart 400 General information ...
Страница 32: ...32 CTC EcoPart 400 General information 7 8 Wiring diagram 400V 3N CTC EcoPart 406 417 ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com ...