![CSI signature 2 hydroxr vs Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/csi/signature-2-hydroxr-vs/signature-2-hydroxr-vs_installation-and-operation-manual_2692691004.webp)
SIGNATURE 2 SERIES
-Installation Requirements-
HYDROXR™ VS Tank
• A level floor position between the well pump and filter tank. (After the pressure tank, if installed.)
• DO NOT install in an area of direct sunlight or where freezing temperatures may occur!
Peroxide Feed System
• Leave ample room near HYDROXR ™ VS Tank to accommodate the Peroxide Feed System.
Filter Tank
• A level floor position ahead of piping into water heater.
• Unit must be installed at least 10’ ahead of the inlet to a water heater to prevent damage due to back-up of hot water.
• DO NOT install unit in an area of direct sunlight or where freezing temperatures may occur!
Installation
4
Note : Caution should always be used in sizing filters! Always choose a unit by first satisfying the Backwash requirement.
Use of a flow control in the Service Line is highly recommended. Consult the factory or your field sales person with ques-
tions.
Содержание signature 2 hydroxr vs
Страница 1: ...SIGNATURE 2 SERIES Signature 2 Series Hydroxr VS Installation Operation Manual ...
Страница 21: ...SIGNATURE 2 SERIES ...
Страница 22: ...SIGNATURE 2 SERIES ...
Страница 23: ...SIGNATURE 2 SERIES ...