background image

 

                                                                                                                

                       

 

            

SIGNATURE  2  SERIES                                                                                        

Greensand Plus

Iron Filter Manual

Installation / Operation

Manual

Содержание greensand plus IF10-S2

Страница 1: ...SIGNATURE 2 SERIES Greensand Plus Iron Filter Manual Installation Operation Manual...

Страница 2: ...tion Page 3 Control Start Up Procedures Page 8 Utilizing Bluetooth Page 11 Master Programming Page 12 Powerhead Assembly Page 13 Valve Body Assembly Page 14 Bypass Assembly Page 15 Additional Informat...

Страница 3: ...als It is recommended that Teflon tape be used to seal plastic Noryl threaded fittings 2 General Specifications IF10 S2 IF15 S2 IF20 S2 IF25 S2 Filter Media Greensand Plus Filter Media Capacity cu ft...

Страница 4: ...ed service The valve then reverses the flow of the water through the filter bed to produce a backwash to the drain Because of the density of the media bed it is very important to size the filter to th...

Страница 5: ...o a water heater to prevent damage due to back up of hot water DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur See Typical Installation Diagram CITY WATE...

Страница 6: ...ntrol valve by unscrewing from the tank b Remove and inspect distributor tube and bottom basket c Replace distributor tube and use a cork or tape to place over top of distributor tube to prevent miner...

Страница 7: ...emove rubber band from float valve 3 Measure distance from bottom of chemical feed valve to the bottom of float with the float in the UP position To move float slide rubber grommets up and down float...

Страница 8: ...ines turn off faucet Initial Control Valve Operation 1 Advance control valve to BACKWASH cycle 1 position and allow water to run to drain for 3 to 4 minutes Warning Close handle on bypass prior to sel...

Страница 9: ...ever occur 3 Default setting is 6 days for filters 5 To Exit Main Menu press the Menu Enter button Note If no buttons are pressed for 60 seconds the Main Menu will be exited automatically 8 Control St...

Страница 10: ...during this time To confirm that the battery is working press either button and the display will turn on for five 5 seconds If power failure occurs while system is regenerating the Isobar 2 will motor...

Страница 11: ...step With Days Remaining Until Next Regeneration at 1 Press and hold the Set Change button After 3 seconds the backwash cycle will begin 3 To Fast Cycle thru regeneration First complete above 2 steps...

Страница 12: ...and 2 this device must accept any interference received including interference that may cause undesired operation Changes or modifications not expressly approved by the party responsible for complian...

Страница 13: ...ge the digits with the Set Change button and accept with the Menu Enter button After the entire display flashes press the Menu Enter button to move to the next menu item 2 Regeneration Cycle Step Time...

Страница 14: ...ad Assy 21003X100 1 1 Softener Circuit Boad Assy 21001X102 1 2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 20001X120 1 6 Power Supply 20001X125 1 7 Back Plate...

Страница 15: ...4 GPM PVC 20251X258 Flow Control Assy 3 0 GPM PVC 20251X259 1 Flow Control Assy 3 5 GPM PVC 20251X260 1 Flow Control Assy 5 0 GPM PVC 20251X262 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Lin...

Страница 16: ...SIGNATURE 2 SERIES Bypass Assembly Ref Description Part Qty 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 15 1 2...

Страница 17: ...p 3 Remove injector assembly Apply silicone lubricant to new injector assembly O rings and install Be sure to push injector assembly tightly so O rings are seated Install a new screen 4 Apply silicone...

Страница 18: ...lve manually to assure proper function Make sure control valve is returned to the service position 13 Make sure there is enough salt in the brine tank 14 Start regeneration cycle manually if water is...

Страница 19: ...the outer edge of each seal to make sure it is seated When all seals and spacers are seated properly you will have a 1 4 of space between the top seal the the top of the valve body 6 Follow Steps E7...

Страница 20: ...water is over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regene...

Страница 21: ...connectionsfor air leaks Internal control leak Call dealer Check piston seals and spacers for scratches and dents 9 Continuous Flow to Drain Foreign material in control piston and seals Call dealer C...

Страница 22: ...SIGNATURE 2 SERIES...

Страница 23: ...SIGNATURE 2 SERIES Notes...

Страница 24: ...SIGNATURE 2 SERIES 710 Orange Street Ashland OH 44805 PH 419 289 1500 FAX 419 289 1515 www watersoftinc com...

Отзывы: