CSI City Softener MSC32-S2 Скачать руководство пользователя страница 24

      

24

Service Instructions / Instructional Videos Available at www.csiwater.com

A. 

General Preliminary Instructions 

 

PERFORM BEFORE ALL SERVICING OPERATIONS

 

1. Turn off water supply to conditioner.

 

    -If the conditioner installation has a “three valve” bypass system, first open the valve in  the bypass line, then    

 

     close the valves at the conditioner inlet and outlet.

 

    -If the conditioner has an integral bypass valve, put it in the bypass position.

  

    -If there is only a shut off valve near the conditioner inlet, close it.

 

2. Remove cover and relieve water pressure in the conditioner by stepping the control into the backwash 

 

    position momentarily. Return the control to the service position.

 

3. Unplug electrical cord from outlet.

 

B. 

To Replace Powerhead

 

1. Remove the control valve cover and disconnect the power supply.

 

2. Disconnect the meter cable from circuit board and feed back through control (if existing meter is being re-used)

 

3. Remove lower back base screws and detach lower back base.

 

4. Remove screw and washer at drive yoke. Remove powerhead mounting screws. The entire powerhead 

 

    assembly will now lift off easily.

 

5. Put new powerhead on top of the valve. Be sure the drive pin on main gear engages slot in drive yoke (wide 

 

 

    side of drive yoke upright must face to the left away form the motor). 

 

6. Replace powerhead mounting screws. Replace screw and washer at drive yoke.

 

7. Reattach lower back base.

 

7. Reconnect meter signal, wire and power supply.

 

8. Reinstall cover.

C. 

To Replace Piston Assembly

 

1. Follow steps 

A1 - A3

 

2. Disconnect the meter signal wire from the circuit board.

 

3. Remove lower back base screws and detach lower back base.

 

4. Remove screw and washer at piston drive yoke. Remove powerhead mounting screws. The entire powerhead    

 

    assembly will now lift off easily.

 

5. Remove piston retaining plate screws.

 

6. Pull upward on end of piston yoke until assembly is out of valve.

 

7. Inspect the inside of the valve to make sure that there is no foreign matter that would interfere with the valve 

                 operation. 
 

8. Install new seals and spacers.

 

9. Take new piston assembly and push piston into valve by means of the end plug. Twist drive yoke carefully in a   

 

    clockwise direction to properly align it with drive gear. Reinstall piston retaining plate screws.

           10. Follow steps 

B5 - B9

D. 

To Replace Seals and Spacers

 

1. Follow steps 

A1 - A3

.

 

2. Disconnect the meter signal wire from the circuit board.

 

3. Remove screw and washer at piston drive yoke. Remove powerhead mounting screws. The entire powerhead    

     

    assembly will now lift off easily. Remove piston retaining plate screws. 

 

4. Pull upward on end of piston rod yoke until assembly is out of valve. Remove seals and spacers. (Note: Special  

 

    end spacer must be reused)

 

5. Lubricate new seals with silicone lubricant included in the seal and spacer kit. Make sure the special end  

 

    

    spacer is properly seated in the valve body. Install new seals and spacers individually, pressing around the  

 

    

    outer edge of each seal to make sure it is seated.  (When all seals and spacers are seated properly, you will    

  

    have a 1/4” of space between the top seal the the top of the valve body)

             6. Follow Steps 

C9 - C10

.

Содержание City Softener MSC32-S2

Страница 1: ...Signature 2 Signature 3 City Softener Manual Installation Operation Manual SIGNATURE 2 SERIES...

Страница 2: ...Page 11 Master Programming Page 13 Utilizing Bluetooth Page 14 Control Valve Powerhead Assy Sig 2 Sig 3 Page 17 Valve Body Assembly Sig 2 Page 18 Bypass Assembly Sig 2 Page 20 Valve Body Assembly Sig...

Страница 3: ...ials It is recommended that Teflon tape be used to seal plastic Noryl threaded fittings Softener Specifications General Specifications Two Tanks In One MSC32 S2 MSC32 S3 MSC48 S2 MSC48 S3 Regeneration...

Страница 4: ...ft water The surfaces of these beads are covered with so dium ions As hard water enters the mineral tank and comes into contact with the resin an exchange of ions takes place as dissolved Calcium and...

Страница 5: ...er DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur See Installation Diagrams for proper placement and plumbing connections A level floor position ahead o...

Страница 6: ...and must discharge below the overflow fitting The brine overflow is provided as a back up in the event the safety float shut off should fail allowing the brine tank to overfill This drain connection w...

Страница 7: ...PEN nearest faucet to evacuate air and repressurize plumbing lines 7 Check for leaks Signature 3 Bypass Shown Drain Line Connection 1 The drain line flow control assembly is pre assembled for your con...

Страница 8: ...te end of brine tank drain line to a suitable drain Electrical Connection 1 Connect the power cord and plug power supply into a 115 volt 60 Hz receptacle Note Do not plug into an outlet controlled by...

Страница 9: ...on After backwash position has been established slightly open bypass to evacuate air from the media tank Fully open valve when all air is depleted This procedure will prevent media from being uplifted...

Страница 10: ...ly is connected to an uninterrupted 115 volt outlet 3 Check that the time of day is set 4 Double check regeneration schedule 5 Make final check for leaks 6 Register your product online at www csiwater...

Страница 11: ...flash 2 To set the Time of Day press the Set Change button First digit will flash Example 12 00 To change digit value press the Set Change button To accept the digit value press the Menu Enter button...

Страница 12: ...ps at its current point in the regeneration position and then restarts at that point when the power is restored The time will be offset by the increment of time the unit was without power so it is nec...

Страница 13: ...the scheduled time A setting of zero will cancel this feature Example Override every 7 days A 07 default setting or cancel setting A 00 Maximum is 29 3 Regeneration Cycle Step Times Steps 1 2 3 4 Exa...

Страница 14: ...the default password the first time you connect to it the app will ask you to enter the password After entering it the first time you should not need to enter it again unless it changes 3 BTLE Valve d...

Страница 15: ...ntrol 1 Change Time of day Press set to set time automatically based on device time 1 Set Backwash Frequency 1 Set Regeneration Time This sets the amount of days between backwash cycles Example For 2a...

Страница 16: ...uctions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interfer...

Страница 17: ...0001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 21001X120 1 6 Power Supply 20001X125 1 7 Back Plate 20001X005 1 8 Lower Front Base For Cover 20111X002 1 9 Motor 20016X006...

Страница 18: ...18 Valve Body Assembly Signature 2...

Страница 19: ...l Assy 3 5 GPM PVC 20017X260 1 7 Drain Line Fitting 1 2 NPT X 1 2 20017X255 1 8 Drain Retainer 20017X214 1 9 Brine Valve 20561X225 1 10 BLFC Assembly 5 GPM 20001X228 1 11 Brine Line Ferrule 20251X305...

Страница 20: ...t Qty 1A Meter Assembly Turbine Complete 20003X200 1 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 1A 1 2 Bypass...

Страница 21: ...21 2 9 1 3 13 14 12 16 17 18 19 21 22 10 11 4 5 6 7 6A 8 15 20 Valve Body Assembly Signature 3...

Страница 22: ...0017X258 1 Flow Control Assy 3 5 GPM PVC 20017X260 1 7 Drain Line Hose Barb Straight 20017X255 1 8 DLFC Clip 20017X214 1 9 Brine Valve 20561X225 1 10 Brine Line Flow Control Assy 20001X228 1 11 Brine...

Страница 23: ...No 1 D15 Bypass 20017X283 2 1 Female Straight Slip Set optional 20017X288 3 1 NPT Elbow Set 20017X284 4 1 NPT Straight Set optional 20017X289 5a Elbow Vertical Adapter Blank optional 20017X295 5b Elbo...

Страница 24: ...ver C To Replace Piston Assembly 1 Follow steps A1 A3 2 Disconnect the meter signal wire from the circuit board 3 Remove lower back base screws and detach lower back base 4 Remove screw and washer at...

Страница 25: ...om front of circuit board 3 Unscrew meter assembly nut from valve body 4 Remove meter from valve body and clean or replace as necessary 5 Reinstall meter nut and cable G To Replace Brine Valve 1 Follo...

Страница 26: ...over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regenerate more...

Страница 27: ...n line and or flow control button Injector and or screen is plugged Clean or replace injector and screen No water in brine tank Check for restriction in BLFC Ensure safety float is not stuck Check bri...

Страница 28: ...alve body cycle power to clear the error code Manually cycle the powerhead through the regeneration cycle steps to verify that the motor can cycle properly while the powerhead is disconnected from the...

Страница 29: ...g from abuse including freezing improper or negligent handling shipping by anyone If the unit has not always been operated within the factory calibrated temperature limits and at a water pressure not...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...32 CSI WATER TREATMENT SYSTEMS 710 Orange St Ashland OH 44805 l PH 419 281 6829 l FAX 419 281 2375 www csiwater com 11 17...

Отзывы: