![CSA 92MSP SERIES Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/csa/92msp-series/92msp-series_installation-instructions-manual_2692507066.webp)
66
Ve
nting
MULTIVENTING OF DIRECT-VENT FURNACES
GENERAL VENTING REQUIREMENTS AND
GUIDELINES
Figures 33 & 34
:
NOTE: WHEN VENTING MULTIPLE FURNACES IN CLOSE PROXIMITY, EACH FURNACE MUST BE
INDIVIDUALLY VENTED – NO COMMON VENTING IS PERMITTED. See
Figures 33 & 34
for positioning of the termi-
nations. When more than two furnaces are to be vented, there must be at least 4 feet between the first two furnaces and
the third and etc.
Figure 33, (Detail A)
below shows the necessary detail for the roof penetration on a standard direct-vent
vertical termination.
FIGURE 33
TWO FURNACE VENTING
FIGURE 34
TWO FURNACE VENTING WITH CONCENTRIC VENTING
3” (8cm) MIN.
12” (32cm) MAX.
COMBUSTION
AIR INTAKE
2” PVC
SEE DETAIL
“A”
A
SEE
8”/20cm
MIN.
12”/31cm MIN. ABOVE
GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL.
CANADA: MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
MINIMUM 12”/31cm IN
U.S. ABOVE AVERAGE
SNOW ACCUMULATION.
MAXIMUM OF 24”/61cm
ABOVE ROOF.*
A
SEE
6’ (1.8m) MINIMUM
10’ (3m) RECOMMENDED
A
SEE
MINIMUM 12”/31cm
ABOVE GRADE IN U.S.
*
ST-A1194-18
DETAIL A
ST-A1194-21
ST-A1194-22
DETAIL A
CONCENTRIC VENTING THROUGH ROOF
CONCENTRIC VENTING THROUGH WALL
TWO PIPE VENTING THROUGH ROOF
TWO PIPE VENTING THROUGH WALL
DIRECT VENT VERTICAL TERMINATION DETAIL
*3” (8cm) minimum only if no snow accumulation is anticipated.
ST-A1194-22
2 FURNACES
➀
Terminations must be greater than 8” apart.
➁
Terminations must be less than 24” apart or greater than
➁
36” apart.
3rd OR MORE FURNACES
Each additional termination must be greater than 48” from
the previous termination.
A
TERMINATIONS MORE THAN
24” ABOVE ROOF PENETRA-
TION REQUIRE ADDITIONAL
SUPPORT.
*CANADA: Termination must conform to CSA
B149.1-10, Sect. 8.14
A
*
12” (31cm) U.S.
CANADA: TERMINATIONS
MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
48” MAX.
(122 cm)
45” MAX.
(114 cm)
36” MAX.
(91 cm)
3” MIN.
(8 cm)
NOTE:
IF 3
Ø
VENTING IS USED,
BOTH PIPES (INTAKE
AND EXHAUST) MUST
BE REDUCED TO 2
Ø
BEFORE PENETRATING
ROOF.
NOTE:
IF 3
Ø
VENTING IS
USED, BOTH
PIPES (INTAKE
AND EX-
HAUST) MUST
BE REDUCED
TO 2
Ø
BEFORE
PENETRATING
ROOF.
Содержание 92MSP SERIES
Страница 34: ...34 Field Conversions ...
Страница 35: ...35 Field Conversions ...
Страница 36: ...36 Field Conversions ...
Страница 37: ...37 Field Conversions ...
Страница 38: ...Field Conversions 38 ...
Страница 84: ...84 High Altitude TABLE 14 SUPPLEMENTAL ORIFICE SIZE CHART HIGH ALTITUDE NATURAL GAS AT HIGH ALTITUDES cont ...
Страница 99: ...99 ...
Страница 100: ...100 CM 0716 ...