background image

                                                                                                            1739 Sabre St. 

Hayward, CA 94545 

 

800-229-4410  www.crysalli.com   

1  

 

02.13.14 

 

 

CR-1SW & CR-2SW Still Chilled Water Countertop                              

Quick Install Guide 

 

1. 

Select a location for you chilled water dispenser. Place unit as close as possible to 

water filter connection & 120-volt electrical outlet. Make sure there is sufficient space at 

the back and between the unit and walls and overhead for proper air circulation and to 

access the air filter.  

 

2. 

Install  Water  Filter  Assembly:

  Mount  the  CR-24FC  water  filter  assembly  on 

wall or other supporting structure or in side cabinet near the angle stop. Connect 

water filter assembly to the angle stop water supply line using minimum 3/8" I.D. 

water  line.  The  outlet  hose  of the filter  system  should  also  be  3/8”.  CR-24FC 

filter head assembly has a ¾” fmp inlet and outlet which must be reduced down. 

Flush water filter system per filter instructions to purge air.  

 

3. 

Water inlet Connection

: Run your 3/8” water line from your water filter system to the 

CR-2SW. The CR-2SW has a 3/8” push-in John Guest fitting at the bottom of it. This 

fitting will accept a 3/8” OD hose. Push in hose into fitting till it stops, then pull back a 

little to make sure it is secure.  

 

4. 

Overflow Drain line

: The clear ½” hose out the bottom is the overflow drain hose which 

should be run to a floor drain or other waste drain.  

 

5. 

Fill Water Bath:

 Remove lid of the unit and fill water bath with non-filtered tap water, fill 

to ¼” from top of white standpipe. This is the white tube in the water bath connected to 

overflow hose. The unit will not work without water bath filled.  

 

6. 

Turn on Water. Check connections for leaks.  

 

7. 

Plug unit power cord into 120-volt outlet. Toggle the ON/OFF rocker switch to the ON 

position. Fan and compressor will turn on. Fan and Compressor will automatically turn 

off when a complete ice bank is made and cycle on and off to maintain it.   

 

8. 

Pull open the still water faucets to run water through the system. Set adjustment arms 

located on the side of the faucets in a horizontal position for full flow. Adjust this little 

arm up or down to restrict water flow as desired.  

 

9. 

Unit will take between 3 & 4 hours to make a complete ice bank in the water bath area. 

Once unit has built the ice bank you are ready to dispense chilled still water. 

 

 

 

 

 

Отзывы: