background image

For details of the other items in the Croydex range please visit our website: www.croydex.com

Croydex, Central Way, Andover, Hampshire, SP10 5AW, UK

Tel: +44 (0) 1264 365881 Fax: +44 (0) 1264 356437

E-mail: [email protected]

8

WSH 015 R02

1

2

3

4

5

 

Step 16

Main Assembly, Drawer

Locate the drawer into the main 

assembly along the slider rails.

Step 17

Main Assembly - Basin

Once your unit is fully assembled, 

lower your basin on top and 

secure using silicon sealant.

Содержание WS040478

Страница 1: ...oduct to ensure that it is fitted safely Always take care when using power tools particularly in the bathroom Always check for hidden cables and pipework before drilling and take extreme care if there is any water in the working area Always wear suitable eye protection when drilling If the product is to be fitted on a ceramic tiled wall a ceramic drill bit should be used Always ensure that the dri...

Страница 2: ...A x 12 B x 14 C x 16 D x 16 E x 1 F x 1 G x 4 H x 2 I x 4 J x 4 K x 1 L x 2 M x 2 N x 6 2 WSH 015 R02 ...

Страница 3: ...oles shown on parts 1 2 3 Step 2 Part 4 C x 8 E x 1 N x 3 Place the relevant components into the location shown in the illustration The rails will only locate into the 3 screwholes when mounting to the correct side panel Step 3 Part 5 Part 6 A x 6 Insert components A into the holes shown on parts 5 6 3 WSH 015 R02 ...

Страница 4: ...4 D x 4 Locate parts 1 2 3 as shown To secure Component D rotate the screw clockwise until it locks onto Component C This action is illustrated Step 6 Step 5 Assembly Part 5 D x 4 Locate part 5 as shown To secure Component D rotate the screw clockwise until it locks onto Component C This action is illustrated 4 WSH 015 R02 Click Click ...

Страница 5: ...side panel Step 8 Main Assembly Part 7 D x 8 Place part 7 onto the main assembly as illustrated and lock into place To secure Component D rotate the screw clockwise until it locks onto Component C This action is illustrated Step 9 Assembling the Drawer Part 8 Part 9 Part 10 Part 11 B x 8 Secure the relevant components into the location shown in the illustration 5 WSH 015 R02 160 185 ...

Страница 6: ...nents into the location shown in the illustration Step 11 Step 9 Assembly Part 12 Part 13 B x 4 Secure the relevant components into the location shown in the illustration Step 12 Step 11 Assembly Part 14 B x 2 Slide part 14 along the groove line and secure into location ...

Страница 7: ... Locate the assemblies of Step 12 and Step 13 as shown To secure Component J rotate the screw clockwise until it locks onto Component C This action is illustrated Step 15 Mounting to wall Main Assembly G x 2 M x 2 Place the unit against the wall to mark the holes for you to drill using an 6mm drill bit Insert the wall plugs into the holes and secure the unit using component G ...

Страница 8: ...ampshire SP10 5AW UK Tel 44 0 1264 365881 Fax 44 0 1264 356437 E mail info croydex co uk 8 WSH 015 R02 1 2 3 4 5 Step 16 Main Assembly Drawer Locate the drawer into the main assembly along the slider rails Step 17 Main Assembly Basin Once your unit is fully assembled lower your basin on top and secure using silicon sealant ...

Отзывы: