Model SCX-16, convection steamer mounted on cabinet base and a steam coil boiler, designed
to ASME Code and approved as a steam boiler restricted to operation at pressure not to
exceed 15 psi.   The steamer has two compartments, each with a pan capacity of 16 (1") pans,
8 (2½”) pans and 4 (4") pans.

BASIC FUNCTION

:

The sequence of operation is as follows:

1. Turn on the main power switch.  A green pilot light will indicate main power is on and steam

generating will begin.  In approximately 20 minutes, sufficient amount of pressurized steam
will have been generated in the heat exchanger and the READY pilot light will come on. 
OFF shuts off the steam supply to the boiler and opens the automatic blowdown valve, if so
equipped, emptying the boiler and releasing water and steam to the drain.  The manual
blowdown valve will have to be opened to drain if not equipped with automatic blowdown
valve.  

2. Boiler pressure gauge should read 9 - 11 psi during operation, 0 psi during shutdown.  

3. The compartment cooker is ready for use when the READY light is on.  Place pans of food

to be cooked into compartment(s) and close door(s).

4. Set timer(s) to cook time desired.  Compartment will pre-heat to 185°F before the timer will

start.  The pre-heat thermostat allows for varying product and size of portions to be cooked. 
Cooking will commence and cooking time may be interrupted at any time by opening door(s)
and resumed again by closing door(s).

5. The buzzer will sound indicating the end of the cooking cycle and that steam has stopped

entering the compartment(s).  The COOKING pilot will go off and the READY light will come
on.  Turn the timer(s) to the OFF position to stop the buzzer.

Содержание SCX-16

Страница 1: ...nstructions thoroughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment Model ________...

Страница 2: ...n adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing operating or servicin...

Страница 3: ...NUMBER 10061R1 3 2006 07 14 TABLE OF CONTENTS DESCRIPTION PAGE Important Notes 2 Service Connections 4 Introduction 5 1 0 Installation Instructions 6 2 0 Information to Steam Fitter 8 3 0 Operating I...

Страница 4: ...INSTALLATION AND OPERATION MANUAL STEAM COIL CABINET BASE CONVECTION STEAMER MODEL SCX 16 PART NUMBER 10061R1 4 2006 07 14 SERVICE CONNECTIONS...

Страница 5: ...boiler and opens the automatic blowdown valve if so equipped emptying the boiler and releasing water and steam to the drain The manual blowdown valve will have to be opened to drain if not equipped wi...

Страница 6: ...sufficient clearances to service the controls door swing etc Also adequate clearance must be left for making the required supply and drain connections Allow enough space between any other piece of eq...

Страница 7: ...marked on floor and insert proper anchoring devices 5 Set unit back in position and re level left to right and front to back 6 Bolt and anchor appliance securely to the floor 7 Seal bolts and flanged...

Страница 8: ...ng to use pipe line would most likely prove inadequate An extremely important consideration is the pressure drop that will occur through the steam supply line from its point of origin to the appliance...

Страница 9: ...uivalent to approximately 32 psi from an original Boiler supply of 40 psi It is suggested that wherever possible the steam supply line to the appliance is a separate line from the steam source If the...

Страница 10: ...ler cabinet requires 3 8 tubing and water pressure of 25 50 psig A manual shut off valve must be provided convenient to the boiler this valve should be open when the boiler is in operation Drain Conne...

Страница 11: ...d when the door is opened Start up procedures for your steamer must be completed once daily prior to operation see instruction plate or above for boiler start up procedures With ready pilot light on p...

Страница 12: ...ing compartment set timers to their OFF position and leave doors slightly open 2 At the end of the day the steam supply must be shut off Open the door of cabinet base and turn off power switch Open ma...

Страница 13: ...ned with a large accumulation bowl it is necessary to flush the sediment from the chamber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the f...

Страница 14: ...ait for the boiler to restore water level and pressure and repeat if necessary PERIODIC MAINTENANCE 1 Water level control should be opened daily to blowdown sediment and scalant 2 Observe that the wat...

Страница 15: ...5 Open water supply to appliance allowing water to fill Generator tank to required level On appliances with Manual Blowdown turn ON power switch Boiler will fill to the required level 6 Let appliance...

Страница 16: ...Keep exposed cleanable areas of unit clean at all times 2 Thoroughly wash oven cavities door liners and pan racks at the end of each day or as required with a mild detergent and water to prevent bacte...

Страница 17: ...enoid 3 Water level control clogged or defective unable to operate fill valve 4 Check drain valve is closed Also check that water level control valve is closed 5 Supply water pressure too low AUTOMATI...

Страница 18: ...sure Use relief valve to release pressure from boiler for setting adjustments 1 HIGH LIMIT PRESSURE SWITCHES Allow pressure to build until unit shuts off This should occur at 15 psi Set the high signa...

Отзывы: