Crown GCX-10 Скачать руководство пользователя страница 9

INSTALLATION & OPERATION MANUAL 10056 REV 0 (03/21)

 PAGE

9    

OF 24

G

as

 F

ired

 S

teamer

O

PERATION

O

PERATION

 

 

WARNING

Do not force the gas control knob. Use only your hand to turn the gas control knob. Never use any tool. If the 

gas control knob will not operate by hand the gas control should be replaced by a qualified service technician.

 

 

WARNING

Do  not  disassemble  the  gas  control;  it  contains  no  replaceable  components. Attempted  disassembly  or 

repair may damage the gas control.

 

 

WARNING

In the event of main burner ignition failure, a 5 minute purge period must be observed prior to re-establishing 

ignition source.

For CSD-1 equipped boilers, see this section for Operation Instructions for CSD-1 Equipped Boilers.

B

oiler

 C

ontrols

 

(Inside Cabinet)

Main Power Switch 

  

-    ON fills the boiler tank and turns the boiler controls on. You should allow 20 minutes to fill 

the tank and generate steam.

 

-  OFF shuts off the boiler controls and opens the automatic blowdown valve, emptying the 

boiler tank and releasing water and steam to the drain. This should be done at least once 

daily to remove sediment, lime, or scale.

Pilot Light  

-   Indicates main power is ON.

Boiler Pressure Gauge

   -   Should read 9 -11 psi during operation; 0 psi during shutdown.

Water Level Sight Glass

   -   Observe level of water in the boiler and water quality. Murkiness in the water indicates 

inadequate water quality; the owner must supply proper water to the boiler (see Water 

Quality Statement).

Water Level Control  

-   While ON, briefly open the water level control daily to remove any sediment that might 

accumulate.

Safety Valve

  

-   This valve will release (pop off) if the boiler has too much pressure. Once a week, this 

valve should be tripped during operation to make sure it functions properly.

 

 

CAUTION

If you smell gas during the lighting procedure, immediately shut off the gas supply until the leak has 

been corrected.

Содержание GCX-10

Страница 1: ...______________ WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroug...

Страница 2: ...intenance instructions thoroughly before installing operating or servicing this equipment NOTICE PURCHASER Instructions to be followed in the event that the operator of this appliance smells gas must...

Страница 3: ...nts Important Notes For Installation and Operation 2 Service Connections 4 Introduction 5 Installation Instructions 6 Operation 9 Operation Instructions for Boilers with CSD 1 Controls 10 Operation In...

Страница 4: ...36 68 5 1740 GCX 10 24 36 5 75 146 25 635 4 75 121 36 CABINET 2 75 70 24 CABINET 4 75 121 24 CABINET 6 75 171 36 CABINET G 3 5 89 5 75 146 6 75 159 36 CABINET 8 203 2 5 64 SERVICE CONNECTIONS ELECTRI...

Страница 5: ...read 9 11 psi during operation 0 psi during shutdown 3 Burners will cycle on and off as required to maintain pressure 4 Compartment cooker is ready for use when READY light is on Place pans of food to...

Страница 6: ...wed to enter the room to compensate for the amount of air removed by any ventilating system and for combustion for the gas burners Do not obstruct the air flow into and around the appliance Do not obs...

Страница 7: ...tes collecting the run off grease in a drip pan usually installed with the filter A strong exhaust fan tends to create a vacuum in the room and may interfere with burner performance or may extinguish...

Страница 8: ...e to clean out any dust dirt or foreign matter before connecting the line to the unit Codes require that a gas shut off valve be installed in the gas line prior to the steamer Make sure the pipes are...

Страница 9: ...allow 20 minutes to fill the tank and generate steam OFF shuts off the boiler controls and opens the automatic blowdown valve emptying the boiler tank and releasing water and steam to the drain This s...

Страница 10: ...erve water gauge sight glass to verify Operation Instructions for Boilers with CSD 1 Controls INITIAL START UP PROCEDURE 1 Open the manual gas shut off supply valve 2 Close the manual blowdown valve i...

Страница 11: ...as valve When pressure drops to 9 psi the pressure switch closes the gas valve will open and ignition should occur Should the pressure rise more than 14 5 psi the Override Pressure Switch will close t...

Страница 12: ...is entering the compartment Cooking pilot light will go off and ready pilot light will come on Buzzer must be shut off by turning the timer to its off position CAUTION An obstructed drain can cause p...

Страница 13: ...be flushed at least once a day CAUTION Protect yourself When flushing control hot water and steam will flow out of the drain When flushing control note water level in gauge glass allow the boiler to f...

Страница 14: ...ial growth and odors 3 Remove drain screens from inside compartment drains Using a plastic bottle brush and mild detergent clean inside the drain opening ensuring there is no food residue or blockage...

Страница 15: ...in half gallon U S of CLR Descaling Solution or use the Optional Deliming Assembly DPA 1 available from your dealer For appliances equipped with CSD 1 descaling solution must be introduced through han...

Страница 16: ...gh signal to switch at 14 5 psi on the gauge and the low signal to 13 0 psi 2 OVERRIDE PRESSURE SWITCHES Allow pressure to increase to 13 psi Set the high signal to switch at 13 psi on the gauge and t...

Страница 17: ...ck that water level control valve is closed 5 Supply water pressure too low Automatic Blowdown Valve Does Not Drain 1 Defective blowdown valve 2 Heat exchanger build up of scalant clogging drain lines...

Страница 18: ...as valve 8 Pressure switch may need to be replaced if relay is operating 9 Check gas control If energized but not operating have replaced Pilot Light Does Not Ignite electronic ignition 1 Gas control...

Страница 19: ...Canned Vegetables 6 10 Lb Can Prunes Dried 12 to 15 Clams Frozen Fresh Cherrystone 10 12 5 6 3 Doz 3 Doz King Crab Frozen Claws Legs 4 4 6 2 1 2 lb 4 1 2 lb Lobster Tail Frozen Lobster Live 10 12 6 5...

Страница 20: ...esh 1 6 Cut 8 5 lb Carrots Baby Whole Frozen Crinkle Cut Frozen Sliced Fresh 8 7 8 11 7 lb 4 lb 9 lb Cauliflower Flowerettes Frozen Fresh 6 7 8 4 lb 5 lb Celery 1 Diagonal Cut 7 5 lb Corn Yellow Whole...

Страница 21: ...above pans since this will interfere with steam circulation between pans in the compartment Always preheat compartments for satisfactory results When time does not allow for defrosting of frozen vege...

Страница 22: ...INSTALLATION OPERATION MANUAL 10056 REV 0 03 21 PAGE 22 OF 24 Gas Fired Steamer Notes...

Страница 23: ...INSTALLATION OPERATION MANUAL 10056 REV 0 03 21 PAGE 23 OF 24 Gas Fired Steamer Notes...

Страница 24: ...ement parts and occasional professional service may be necessary to extend the useful life of this appliance When service is needed contact a Crown Authorized Service Agency or your dealer To avoid co...

Отзывы: