Crown ECX-16 Скачать руководство пользователя страница 10

INSTALLATION AND OPERATION MANUAL, 

ELECTRIC CABINET BASE CONVECTION STEAMER, ECX-16, ECX-24

4.0  OPERATING INSTRUCTIONS

For CSD-1 equipped boilers, see section 5.0.

BOILER CONTROLS

 (Inside Cabinet)

Main Power Switch 

- ON fills the boiler tank and turns the boiler heaters on.  You should

allow 20 minutes to fill the tank and generate steam.

- OFF shuts off the boiler heaters and opens the Automatic

Blowdown Valve, emptying the boiler tank and releasing water and
steam to the drain.  This should be done daily to remove sediment,
lime, or scale.

Pilot Light 

- Indicates main power is ON.

Boiler Pressure Gauge 

- Should read 9 - 11 psig during operation; 0 psig during shutdown.

Water Level Sight Glass - Observe level of water and water quality in the boiler.  Murkiness in

the water indicates inadequate water quality; the owner must supply
proper water to the boiler (see page 4).

Water Level Control

- While boiler is ON, briefly open the water level control valve once a

day to remove any sediment that might accumulate.  (See page 12
for detailed instructions.)

Safety Valve 

- This valve will release (pop off) if the boiler has too much pressure. 

Once a week, this valve should be tripped during operation to make
sure it functions properly.

OPERATION OF THE BOILER

Turn on water and power supply to appliance. 

Open cabinet door and turn main power switch ON.  Pilot light ignites and water begins to fill
boiler - observe water gauge sight glass to verify that proper water level is reached.

Once the proper water level is reached, the heaters begin to heat the water.  Heaters require
about 15 minutes to begin steam generation.  The boiler pressure gauge in the cabinet should
indicate steam pressure in a range of 9 to 11 psig.

SHUT DOWN

Turn the Main Power Switch OFF.  Open manual drain valve.  If unit is supplied with Automatic
Blowdown Valve, it will open, draining the boiler and releasing hot water and steam to the drain.

MANUAL 10063R4

10

2020-07-08

Содержание ECX-16

Страница 1: ...e instructions thoroughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment Model _____...

Страница 2: ...or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing operating or servicing this equipment CAUTION Operat...

Страница 3: ...GE Important Notes for Installation and Operation 2 1 0 Service Connections 4 2 0 Introduction 6 3 0 Installation Instructions 7 4 0 Operating Instructions 10 5 0 Boilers with CSD 1 Controls 13 6 0 Pe...

Страница 4: ...INSTALLATION AND OPERATION MANUAL ELECTRIC CABINET BASE CONVECTION STEAMER ECX 16 ECX 24 1 0 SERVICE CONNECTIONS MANUAL 10063R4 4 2020 07 08...

Страница 5: ...INSTALLATION AND OPERATION MANUAL ELECTRIC CABINET BASE CONVECTION STEAMER ECX 16 ECX 24 1 0 SERVICE CONNECTIONS MANUAL 10063R4 5 2020 07 08...

Страница 6: ...boiler and opens the automatic blowdown valve if so equipped emptying the boiler and releasing water and steam to the drain The manual blowdown valve will have to be opened to drain if not equipped w...

Страница 7: ...hat there are sufficient clearances to service the controls door swing etc Also adequate clearance must be left for making the required supply and drain connections Allow enough space between any othe...

Страница 8: ...on top appliance and re level side to side and front to back 7 Bolt and anchor appliance securely to the floor 8 Seal bolts and flanged feet with silastic or equivalent compound ELECTRICAL CONNECTIONS...

Страница 9: ...uld be open when the boiler is in operation WARNING If your equipment was supplied with split water lines and a water treatment system connect the system to the connection marked FILTERED WATER IN onl...

Страница 10: ...ter Level Control While boiler is ON briefly open the water level control valve once a day to remove any sediment that might accumulate See page 12 for detailed instructions Safety Valve This valve wi...

Страница 11: ...d buzzer will sound indicating the end of the cooking cycle Steam generation will cease Cook light will go out and Ready light will come on To silence buzzer turn timer to its off position With ready...

Страница 12: ...e drain screen Frequently check the drain screen for accumulation of food particles Should food particles accumulate against or clog the drain screen remove it clean it thoroughly and then replace it...

Страница 13: ...he proper level the level control will stop the flow of water to the boiler As water is consumed in the production of steam the level control will supply additional water to the boiler Firing Cycle Th...

Страница 14: ...come on High Pressure Condition A high pressure safety switch is installed on the boiler Should the pressure exceed the limit of this device the boiler will be shut down and put into a state of locko...

Страница 15: ...chamber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the float in the control Control must be flushed at least once a day CAUTION Protect yo...

Страница 16: ...er in gauge glass is clean and clear Extreme murkiness in water indicates inadequate water quality 3 Safety valve should be tripped during operation once a week to assure that it functions properly 4...

Страница 17: ...er 4 Replace 3 4 pipe plug securely 5 Open water supply to appliance allowing water to fill boiler to required level 6 Let appliance cycle allow two hours for descaling and cleaning DO NOT TURN ON STE...

Страница 18: ...at all times 2 Thoroughly wash steamer cavities door liners and pan racks at the end of each day or as required with a mild detergent and water to prevent bacterial growth and odors 3 Remove drain sc...

Страница 19: ...ET BASE CONVECTION STEAMER ECX 16 ECX 24 8 0 ADJUSTMENTS TO CALIBRATE PRESSURE SWITCHES NOTE Pressure switches are factory set Calibration is only required if pressure switches are replaced or if adju...

Страница 20: ...h Use relief valve to release pressure from boiler for setting adjustments High Limit Pressure Switches Allow pressure to build until unit shuts off This should occur at 15 PSI Set the adjusting nut t...

Страница 21: ...damage to door gasket 2 Compartment drain opening or associated piping may be blocked WATER ACCUMULATES IN THE COMPARTMENT 1 Compartment drain screen clogged Remove and clean thoroughly and then repl...

Страница 22: ...TROUBLESHOOTING Continued AUTOMATIC BLOWDOWN VALVE DOES NOT DRAIN 1 Defective blowdown valve 2 Boiler build up of scalant clogging drain lines and valve BOILER ACHIEVES PRESSURE SLOWER THAN NORMAL 1...

Отзывы: