
11”
1
1
/
2
”
Underside
view of
fixing holes
3
Installation
-
wall
l
Mark the two basin fixing holes on the finished wall.
4
Installation
-
wall
l
Drill 1/4” holes at the marked locations.
l
Install hanger bolts so they extend 11/2” beyond the finished
wall.
5
Installation
-
wall
6
Installation
-
wall
l
Position the basin on the hanger bolts through the fixing holes.
l
Level and secure the basin using cap nuts and washers.
DO NOT OVERTIGHTEN!
l
Apply sealant.
l
Fit overflow cap.