Crosswater Waldorf US-WF0613 Скачать руководство пользователя страница 4

11”

1

1

/

2

Underside

view of

fixing holes

3

 

Installation 

wall

l

Mark the two basin fixing holes on the finished wall.

4

 

Installation 

wall

l

Drill 1/4” holes at the marked locations.

l

Install hanger bolts so they extend 11/2” beyond the finished 

wall.

5

 

Installation 

wall

6

 

Installation 

wall

l

Position the basin on the hanger bolts through the fixing holes.

l

Level and secure the basin using cap nuts and washers. 

DO NOT OVERTIGHTEN!

l

Apply sealant.

l

Fit overflow cap. 

Отзывы: