Crosswater US-WF0813SCW Скачать руководство пользователя страница 4

(x8) 31” / 39” Frame

(x12) 59” Frame

1

/

4

” 

Underside

view of

fixing holes

6

7

Determine the final installation position and mark the wall 

fixing hole positions in pencil. Please make sure the frame is 

level, if required adjust the leg pins.

Using a 

1

/

4

” drill bit drill the required holes on the marked 

positions. 

Note:

 In the event that the wall fixings supplied being 

inappropriate for the wall, please source alternatives.

8

9

Fix the brackets onto the wall using the screws provided. 
Fix the support nylons to the adapters using the screws. Fit the 

adapters to the legs and rear supports and secure with grub 

screws.

Place the basin in position ensuring that it is level.
Mark the basin fixing holes on the finished wall.

Содержание US-WF0813SCW

Страница 1: ...ng holes in a wall or floor Introduction All parts have been fully inspected throughout the production process and only leaves our factory after a 15 stage QC process Carefully remove the items from t...

Страница 2: ...311 2 11 215 8 26 187 8 10 1 16 3 1 8 393 8 11 215 8 337 8 187 8 10 1 16 3 1 8 591 16 11 215 8 11 539 16 291 2 187 8 10 1 16 3 1 8 Dimensions 31 Basin 39 Basin 59 Basin...

Страница 3: ...leg ensuring threaded front rail is facing forwards Right hand leg Fit front rail to side of right hand leg screw side rail into front rail through rear of right hand leg Left hand leg Fit front rail...

Страница 4: ...rill the required holes on the marked positions Note In the event that the wall fixings supplied being inappropriate for the wall please source alternatives 8 9 Fix the brackets onto the wall using th...

Страница 5: ...holes at the marked locations 11 Install the hanger bolts so they extend 11 2 beyond the finished wall 12 Position the basin on the frame so the hanger bolts extend through the fixing holes Secure the...

Страница 6: ...33 2 11 1 Installation basin wall 2 3 Mark the horizontal centerline on the wall 31 Basin and 39 Basin Mark the basin fixing holes on the finished wall 14 Fit overflow cap...

Страница 7: ...g holes on the finished wall Drill 1 4 holes at the marked locations 6 7 Install the hanger bolts so they extend 11 2 beyond the finished wall Position the basin on the hanger bolts through the fixibg...

Страница 8: ...duct Frame Use a soft dampened sponge or cloth Never use an abrasive material such as a brush or scouring pad to clean surfaces Basin Always test your cleaning solution on a concealed area before appl...

Отзывы: