
BASE
Shut off the water heating system then, with the main water
supply
turned off
, open the lowest hot and cold faucets and allow
to drain until supply pipes are empty.
water feed as shown opposite.
ATTENTION: Check all new connections for leaks.
Turn on the main water supply, close all faucets except for the new
Installation
Parts list
wall outlet
G1/2
1/
2-14
N
PT
G1/2
1/
2-14
N
PT
G1/2
1/
2-14
N
PT
CONNECTOR
CHECK VALVE
WASHER
BASE
SCREW
CONNECTOR
O-RING
CONNECTOR
CHECK VALVE
WASHER
BASE
CONNECTOR
O-RING
CONNECTOR
CHECK VALVE
WASHER
US-ARC953
US-WL952
US-WL953
US-ARC953
US-WL952
US-WL953
supply.
US-WF953
BASE
CONNECTOR
CHECK VALVE
WASHER
US-WF953