
Tower Unit Installation
Step 1
Plan unit position
We suggest positioning the
tower unit so it is level with
any other unit that has been
installed.
Step 2
Remove the TOP door before installation. a: Lift the tab
(shown) on both hinges, to release. b: Pull door back.
Step 3
a:
Use the measurements opposite, to
position the ‘wall brackets.
b:
Mark the fixing hole positions onto the
wall.
Drill Ø 8mm holes, insert the wall plugs
and the ‘wall brackets’.
c:
The ‘wall brackets’ should protrude
from the wall by 5-7mm.
Position the unit on the wall brackets.
Step 4
a: Check the unit is level. If leve-
ling is required: inside the unit,
use a screwdriver to adjust the
hanging position.
d: To lift or lower the unit adjust the
screw shown.
c: To move the unit closer or fur-
ther from the wall adjust the screw
shown.
Step 5
Once the unit is correctly
levelled, carefully apply a
bead silicone sealant to
the join between the unit
and wall, on all four sides.
Leave silicone, 24 hours
to dry.
Step 6
Note:
Only re-fit the door now if
not
changing the opening side.
Re-fit door:
a:
Reposition both hinges onto the
hinge plates.
b:
Push the front until the hinge
‘clicks’ into position.
If changing the door opening
side or the door alignment
needs adjusting, follow the ins-
tructions on the next page.
2