Crosswater GLIDE II GL3516F Скачать руководство пользователя страница 2

Tower Unit Installation

Step 1

Plan unit position

We suggest positioning the

tower unit so it is level with

any other unit that has been

installed.

Step 2

Remove the TOP door before installation. a: Lift the tab 

(shown) on both hinges, to release. b: Pull door back.

Step 3

a:

 Use the measurements opposite, to 

position the ‘wall brackets.

b:

 Mark the fixing hole positions onto the 

wall.
Drill Ø 8mm holes, insert the wall plugs 

and the ‘wall brackets’.

c: 

The ‘wall brackets’ should protrude 

from the wall by 5-7mm.
Position the unit on the wall brackets.

Step 4

a: Check the unit is level. If leve-

ling is required: inside the unit, 

use a screwdriver to adjust the 

hanging position.
d: To lift or lower the unit adjust the 

screw shown.
c: To move the unit closer or fur-

ther from the wall adjust the screw 

shown.

Step 5

Once the unit is correctly 

levelled, carefully apply a 

bead silicone sealant to 

the join between the unit 

and wall, on all four sides.
Leave silicone, 24 hours 

to dry.

Step 6

Note:

  Only  re-fit  the  door  now  if 

not 

changing the opening side.

Re-fit door:

a: 

Reposition both hinges onto the 

hinge plates.

b:

 Push the front until the hinge 

‘clicks’ into position.

If changing the door opening 

side or the door alignment 

needs adjusting, follow the ins-

tructions on the next page.

2

Отзывы: